GOOD MORNING EVERYONE. WELCOME TO THE APRIL 27TH MEETING OF THE CITY OF NAPLES COMMUNITY REDEVELOPMENT ADVISORY BOARD. THANK EVERYONE FOR COMING AT THIS TIME. I'M GOING TO TURN IT

[1) SWEARING-IN OF NEW MEMBER]

OVER. WE HAVE A NEW MEMBER AND WE'RE GOING TO HAVE A LITTLE SWEARING IN CEREMONY. GOOD MORNING. JESSICA ROSENBERG, DEPUTY CITY CLERK. RECENTLY, THE CITY COUNCIL TOOK ACTION TO APPOINT A NEW MEMBER. I'M GOING TO GO AHEAD AND SWEAR THEM IN, MR. LEE DAVIDSON. PLEASE RAISE YOUR RIGHT HAND AND REPEAT AFTER ME. I. AND THEN SAY YOUR NAME. I SOLEMNLY SWEAR OR AFFIRM, SOLEMNLY SWEAR THAT I WILL SUPPORT THE CONSTITUTION THAT WILL SUPPORT THE CONSTITUTION, AND WILL UPHOLD THE LAWS OF THE UNITED STATES AND THE STATE OF FLORIDA, THAT I WILL IN ALL RESPECTS. I WILL OBSERVE THE PROVISIONS OF THE CHARTER AND ORDINANCES OF THE CITY OF NAPLES, AND WILL FAITHFULLY PERFORM THE DUTIES OF THE OFFICE OF COMMUNITY REDEVELOPMENT AGENCY, ADVISORY BOARD MEMBER. NEW REDEVELOPMENT AGENCY ADVISORY BOARD MEMBER.

THANK YOU. AT THIS TIME, I WOULD LIKE TO HAVE A ROLL CALL. MEMBER. CHIEF HERE. MEMBER.

[2) ROLL CALL]

DAVIDSON HERE. MEMBER HESTER IS ABSENT. MEMBER SCHUCHART HERE. MEMBER ZELAYA HERE. VICE CHAIR MATONTI HERE. AND CHAIR WALLER HERE. THANK YOU. OKAY. AND THEN.

[3) PLEDGE OF ALLEGIANCE]

MADAM CHAIR, WOULD YOU MIND IF WE TAKE A QUICK PHOTO? WE HAVE A PHOTO OPPORTUNITY WITH OUR NEW MEMBER HERE. SO WE CAN AND MAKE THAT ANNOUNCEMENT WITH A PHOTO. UP AND GET YOUR SMILE HANDY. WE WANT TO TAKE A QUICK PHOTO OF THE GROUP. EVERYBODY. NEED TO. FOR. THREE AND THREE.

YEAH, JUST THE BOARD. JUST SO WE'LL DO FOUR AND TWO. OKAY. DO YOU WANT ME DOWN THERE OR. NO.

NO. COME ON. GO AHEAD. CAN WE STAND UP FROM BACK HERE? YES. OKAY. YOU WANT ME DOWN IN FRONT? I'M SORRY. YEAH.

[4) SET AGENDA]

[00:05:23]

OKAY. THANK YOU ALL. AT THIS TIME. WE'D LIKE APPROVAL TO SET AGENDA. IS THERE ANY CHANGES OR CORRECTIONS? JUST NEED A MOTION TO APPROVE. ANYONE. MOTION TO APPROVE. THANK YOU. SECOND. SECOND. ALL IN FAVOR? AYE. AGENDA IS SET. DO WE HAVE ANY

[5) PUBLIC COMMENT]

PUBLIC COMMENTS AT THIS TIME? I HAVE NO SLIPS. OKAY. THANK YOU VERY MUCH. I NEED I HOPE

[6) MINUTES]

EVERYONE HAD HAD A CHANCE TO REVIEW THE MINUTES. AND I WILL ENTERTAIN A MOTION TO APPROVE.

MOTION TO APPROVE. THANK YOU. SECOND, ANY ANY CHANGES? CORRECTIONS. HEARING? NONE. ALL IN FAVOR? AYE. THANK YOU. MINUTES ARE APPROVED. OUR FIRST ITEM IS A APPROVAL OF THE.

[7.A) Presentation of the 1st Ave South, 12th Street South and 10th Street 60% Design Plans.]

BUSINESS. PRESENTATION FROM FIRST AVENUE SOUTH ON OUR DESIGN DISTRICT. WE HAD A 60% COMPLETION STAGE. SO I'LL TURN IT OVER TO ANITA. THANK YOU, MADAM CHAIR. TO INTRODUCE THIS ITEM, WE WILL BE RECEIVING THIS MORNING A 60% DESIGN PHASE OF OUR PROJECT THAT IS FIRST AVENUE SOUTH, 12TH STREET SOUTH AND 10TH STREET SOUTH. AND FOR OUR NEW MEMBERS. THIS PROJECT WAS APPROVED BY THE CRA FOR FUNDING BACK IN AUGUST OF 23. THE. THE 30% DESIGN WAS PRESENTED TO THE CRAB AND THE CRA, AND THEY PROVIDED DIRECTION AT THAT TIME IN JUNE OF 24 ON THE CROSS SECTIONS OF THE STREET. SO THEY HAVE BEEN WORKING TOWARDS THAT DIRECTION.

FOLLOWING THAT, IN NOVEMBER OF 25, THE CRA APPROVED ADDITIONAL SERVICES FOR MORE STORMWATER MANAGEMENT TO GO DOWN FIRST AVENUE SOUTH WITH AN OUTFALL ON GOOD LOOK. AND THAT ADDRESSED SOME OF THE MULTI BASIN STUDY PROJECTS AS WELL. SO TODAY WE HAVE WITH US OUR CONSULTANTS MISTER DANIEL FLYNN AND DATING ALBERT ALBERTSON ALBERS AND OUR PROJECT MANAGER DANIEL ORENSTEIN. HE'S WITH HE'S THE CITY OF NAPLES CITY ENGINEER AND OUR PROJECT MANAGER FOR THE CRA PROJECT. SO THEY WILL GO THROUGH THE 60% DESIGN FOR YOU IN A PRESENTATION. AND IF YOU HAVE ANY QUESTIONS, YOU CAN RAISE THEM AT THAT TIME. FOLLOWING THEIR PRESENTATION, IF YOU HAVE ANY COMMENTS OR RECOMMENDATIONS, WE'LL BE HAPPY TO DELIVER THOSE TO THE CRA. SO IF IF YOU ALL ARE READY, WE'LL BEGIN WITH THE PRESENTATION OF THE 60% DESIGN. OKAY. GOOD MORNING. AND JUST TO INTRODUCE MYSELF REAL QUICK. DAN ORENSTEIN, CITY ENGINEER, STORMWATER MANAGER. SINCE THE TIME OF THE 30% PRESENTATION, SHRADY MANOR HAS BECOME PAPE DAWSON AND THEY'VE BEEN WORKING HARD TO DEVELOP THE PLANS. ACCORDING TO THE INPUT FROM OUR COMMUNITY STAKEHOLDERS. THE PLANS INCORPORATE THE FINDINGS OF FIELD INVESTIGATIONS AND INITIAL AGENCY COORDINATION. THE PLANS ALSO NOW INCLUDE MAJOR STORMWATER IMPROVEMENTS AS WELL AS STRUCTURAL DESIGN. SO NECESSARY TO BUILD NEXT TO THE NEW ENCORE BUILDING AT NAPLES SQUARE. TO PROVIDE YOU WITH A COMPLETE PRESENTATION OF THE WORK, PLEASE ALLOW ME TO TURN THIS OVER TO MR. DANIEL FLYNN WITH PAPE DAWSON. THANK YOU. ALRIGHTY. THANK YOU. DAN.

I THINK I'VE BEEN INTRODUCED A COUPLE OF TIMES, BUT I'M DANIEL FLYNN, I'M THE PROJECT MANAGER WITH PAPE DAWSON, SO FORMERLY GRADY MINOR TO PRESENT TO YOU THE THE 60% PLAN UPDATE FOR THE FIRST AVENUE SOUTH, 12TH STREET SOUTH AND 10TH STREET STREETSCAPE DESIGN PROJECT.

IT'S QUITE A MOUTHFUL. I'LL TRY TO MAKE IT GO. JUST CLICK. HOW DO YOU MAKE THE PRESENTATION GO FORWARD? DO I JUST SAY NEXT SLIDE. IS THERE A CLICKER? OH, YOU'RE MISSING THE MOUSE. GET A MOUSE. THANK YOU. ALRIGHTY. SO THROUGH THE PRESENTATION WE'LL GIVE YOU A PROJECT RECAP. SO GO

[00:10:09]

THROUGH EVERYTHING THAT GOT US UP TO THIS POINT. WE'RE GOING TO GO THROUGH SOME 60% DESIGN UPDATES. SOME DIRECTION WAS GIVEN TO US. AFTER THE CONCEPT LEVEL PLANS. BUT ONCE WE GOT INTO THE DESIGN, SOME THINGS DID CHANGE. JUST BASED ON FIELD CONDITIONS. WE'LL GET INTO A PHASING DISCUSSION AND THEN THE PATH FORWARD. SHOULD BE THE SCROLL WORK. THE KEYBOARD'S RIGHT HERE ON THE KEYBOARD. ALL RIGHTY. PERFECT. ALL RIGHT. ALRIGHTY. SO TO RECAP THE PROJECT. SO THE PROJECT LIMITS. IT'S THE NON SHADED AREA. BUT ALONG FIRST AVENUE SOUTH. SO THE PROJECT EXTENDS FROM EIGHTH STREET EAST TO GOODLETTE ON 12TH STREET SOUTH. IT EXTENDS FROM THE INTERSECTION OF FIRST AVENUE SOUTH NORTH TO CENTRAL AVENUE ON 10TH STREET. IT EXTENDS FROM US 41 NORTH, ABOUT ONE MILE TO SEVENTH AVENUE NORTH, AND THEN ALONG GOODLETTE FRANK ROAD. THERE'S SOME STORMWATER IMPROVEMENTS THAT ARE PROPOSED WITHIN A 30 FOOT DRAINAGE EASEMENT THAT IS JUST WEST OF THE COUNTY RIGHT OF WAY. SO GOING THROUGH THE SCOPE OF EACH OF THE CORRIDORS. SO WHAT YOU SEE HIGHLIGHTED RED. SO THAT SCOPE INCLUDES COMPLETE STREETS, PARKING, LIGHTING, IRRIGATION AND LANDSCAPING, AS WELL AS STORMWATER AND UTILITY IMPROVEMENTS. THE AREA IDENTIFIED IN GREEN. SO THIS IS EVERYTHING ON 10TH STREET SOUTH OF FIRST AVENUE NORTH. THAT INCLUDES STORMWATER AND UTILITY IMPROVEMENTS. SO FOR THIS PORTION OF THE CORRIDOR, OBVIOUSLY WHEN YOU INSTALL DRAINAGE AND UTILITY INFRASTRUCTURE YOU'RE GOING TO IMPACT WHAT'S ABOVE IT. SO THIS AREA WE'RE JUST GOING TO BE RECONSTRUCTING THE SAME FOOTPRINT OF THE ROADWAY. SO HORIZONTALLY NOTHING'S GOING TO CHANGE. ALONG WITH THE LANDSCAPING AND LIGHTING THAT'S IMPACTED, IT WILL JUST GO IN AS IT IS TODAY. AND THEN THE BLUE AREA. SO THIS IS THE NORTHERN END ON 10TH STREET. SO THIS IS MORE OF THE RESIDENTIAL AREA. THIS INCLUDES THE COMPLETE STREETS IRRIGATION LANDSCAPING STORMWATER UTILITY. WHAT IS NOT INCLUDED IN THIS AREA WOULD BE PARKING AND LIGHTING. AND THEN THE STORMWATER IMPROVEMENTS ALONG THAT DRAINAGE EASEMENT, WHICH IS A 30 FOOT DRAINAGE EASEMENT JUST WEST OF GOODLETTE FRANK'S COUNTY RIGHT OF WAY. I'M GOING THROUGH HOW WE GOT TO THIS POINT. SO WE DID HAVE A PUBLIC MEETING BACK IN APRIL OF 2024. WE WENT THROUGH A COUPLE OF DIFFERENT ALTERNATIVES FOR EACH CORRIDOR. WE TOOK THAT INFORMATION. WE GOT BACK FROM THE PUBLIC. WE PRESENTED THIS ADVISORY BOARD BACK IN MAY. WE TOOK THE RECOMMENDATIONS FROM THE ADVISORY BOARD TO THE CRA IN JUNE. WE WENT BACK TO THE CRA TO DISCUSS FIRST AVENUE SOUTH IN A LITTLE MORE DETAIL. ORIGINALLY, WE WERE MOVING FORWARD WITH A RAISED BIKEWAY ALONG FIRST AVENUE SOUTH. AFTER THAT DISCUSSION, WE ENDED UP MOVING FORWARD WITH A TEN FOOT WIDE SIDEWALK ON BOTH THE NORTH AND SOUTH SIDE OF THE ROAD. THEN WE MOVE FORWARD, AND AS ANITA AND BOTH DAN MENTIONED, WE LOOKED AT THE MULTI BASIN ASSESSMENT PROJECT AND IDENTIFIED A CRITICAL ELEMENT OF THAT, WHICH WE'LL GET INTO THAT WE COULD INCORPORATE INTO THIS PROJECT. SO THAT WAS ADDED TO THE PROJECT. WE THEN SCHEDULED A PRE-APPLICATION MEETING BECAUSE THE DRAINAGE INFRASTRUCTURE WAS PRETTY ROBUST WITH THE SOUTH FLORIDA WATER MANAGEMENT DISTRICT ON APRIL 1ST. FROM THAT, WE THEN ADDED A STRUCTURAL ELEMENT BECAUSE A PORTION OF THE DRAINAGE EASEMENT WAS VACATED ADJACENT TO A BUILDING THAT'S UNDER CONSTRUCTION. SO WE HAD TO ADD SOME STRUCTURAL SCOPE FOR BOX CULVERTS, RETAINING WALLS AND THINGS LIKE THAT. AND THEN HERE WE ARE TODAY. SO WE HAVE THE 60% DESIGN WAS SUBMITTED TO THE CITY ON APRIL 10TH. AND THEY ARE CURRENTLY REVIEWING THAT. GOING THROUGH WHAT'S INCLUDED IN THE PROJECT. SO THERE ARE SOME RESILIENCY ITEMS WITH ANY COMPLETE STREETS PROJECT YOU WANT TO PROMOTE WALKABILITY, WHICH WOULD BE PROPOSING SHADE TREES ALONG THE CORRIDOR, THE DRAINAGE LEVEL OF SERVICE FROM THE EXISTING CONDITION WILL BE IMPROVED WITH THE IMPROVEMENTS WE'LL DISCUSS. THERE IS ALSO A STORMWATER CHECK VALVE JUST UPSTREAM OF THE BOX CULVERT FOR THE THE OUTFALL IMPROVEMENTS. THIS IS A TIDALLY INFLUENCED OUTFALL ON THE GORDON RIVER. SO THIS STORMWATER CHECK VALVE. WHEN THE TIDE IS HIGH, IT WILL PREVENT WATER FROM GOING BACK INTO THE STORMWATER SYSTEM WE'RE PROPOSING. AND THEN SOME TRAFFIC CALMING AND SAFETY ITEMS THAT ARE INCLUDED. YOU CAN SEE THE IMAGE TO THE RIGHT.

[00:15:01]

THERE ARE SOME AREAS ON 10TH STREET, AND I'M SURE YOU'VE ALL DRIVEN IT, WHERE PARALLEL PARKING IS A LITTLE TOO CLOSE TO THE INTERSECTION. SO WHEN YOU APPROACH IT IN THE EAST AND WEST DIRECTION, SIGHTLINES ARE OBSTRUCTED. SOME HORIZONTAL TRAFFIC CALMING TREATMENTS WERE INCLUDING OUR CURB EXTENSIONS, WHICH PROVIDE A LITTLE MORE AREA FOR LANDSCAPING. AND WE'RE ALSO REDUCING SOME LANE WIDTHS TO REALLY TIME. THE PERSPECTIVE OF THE DRIVER HELP SLOW CARS DOWN. VERTICAL TREATMENTS, WHICH WE'LL GET INTO. DIFFERENT LOCATIONS ARE RAISED INTERSECTIONS AND CROSSWALKS TO HELP SLOW CARS DOWN, AND ALSO PROVIDE A SAFE AREA FOR PEDESTRIANS TO CROSS. AND WE'RE ALSO PROVIDING SIDEWALK CONNECTIVITY WITHIN THE ENTIRE PROJECT, GOING THROUGH THE ALTERNATIVES THAT WERE MOVING FORWARD WITH. SO ON FIRST AVENUE SOUTH. SO THAT IS THE ALTERNATIVE ON THE FAR LEFT. THIS IS WITHIN AN EXISTING 80 FOOT CITY OWNED RIGHT OF WAY. SO WE HAVE THE 210 FOOT WIDE SIDEWALKS ON BOTH THE NORTH AND SOUTH SIDE OF THE ROAD. WE ALSO HAVE PARALLEL PARKING ON BOTH SIDES OF THE ROAD. AND THEN THOSE CURB EXTENSIONS IS WHERE YOU CAN SEE THE THE CURB LINE GOING TO THE EDGE OF TRAVEL, WHICH PROVIDE US A LITTLE MORE ROOM FOR LANDSCAPING. AND THEN IF YOU GO TO THE MIDDLE IMAGE, SO THAT'S 10TH STREET NORTH. THE RIGHT OF WAY DOES GET A LITTLE BIT NARROWER. SO WE'RE 60FT WITH THE RIGHT OF WAY THERE. AND I'M SURE YOU'VE ALL DRIVEN DOWN 10TH STREET ON THE EAST SIDE OF THE ROAD TODAY. THERE'S AN EXISTING SIDEWALK AND PARALLEL PARKING. SO WE'RE GOING TO TRY TO MAINTAIN THAT WITH THIS PROJECT. ON THE WEST SIDE, WE HAVE THE PERPENDICULAR PARKING AND THERE'S NOT CONNECTIVITY FROM A SIDEWALK PERSPECTIVE. SO WE ARE IMPROVING THE WEST SIDE OF THE ROAD TO INCLUDE PARALLEL PARKING AND SIDEWALKS. AND THEN 12TH STREET, VERY SIMILAR 60 FOOT RIGHT OF WAY. AND WITH BOTH 10TH STREET AND 12TH STREET, THE BICYCLE FACILITIES WERE PROPOSING ARE SHARED LANE MARKINGS OR SHARROWS. SO BICYCLISTS, BICYCLISTS WILL ESSENTIALLY TAKE THE LANE AND DRIVE WITHIN THE STREET. AND AS YOU CAN SEE, THERE ARE A COUPLE RENDERINGS. SO THE FIRST ON THE LEFT WOULD BE WHAT THE RAISED INTERSECTION MAY LOOK LIKE. WE CHANGED THE THE TEXTURE OF THE INTERSECTION. WE ARE PROPOSING PAVERS. THIS INTERSECTION IS RAISED SO AS VEHICLES ARE TRAVELING NORTH AND SOUTH, IT WILL SLOW THEM DOWN. AND THEN ON THE IMAGE ON THE RIGHT IS 12TH STREET SOUTH. YOU CAN SEE THE THE SIDEWALKS ON BOTH SIDES OF THE ROAD AS WELL AS THE PARKING. AND THEN AS I MENTIONED, THE CYCLISTS WOULD UTILIZE THE STREET FOR THEIR USE. GOING THROUGH THE RAISED INTERSECTION AND CROSSWALKS LOCATIONS. AND WE COULD GET INTO MORE DISCUSSION ABOUT THIS AFTER THE PRESENTATION. BUT THE IMPORTANT THING WITH THIS IS WE WANT TO MAKE SURE WE'RE MAINTAINING THAT 3 TO 400 FOOT LENGTH IN BETWEEN EACH RAISED CROSSWALK OR INTERSECTION.

ANYTHING BEYOND THAT KIND OF DOESN'T WORK AS WELL AS FAR AS CALMING TRAFFIC. SO YOU CAN SEE WE DO HAVE THREE RAISED INTERSECTIONS, ONE AT THIRD AVENUE NORTH AND 10TH, FIRST AVENUE SOUTH, AND 10TH, AND THEN 12TH STREET AND FIRST AVENUE SOUTH. AND THEN YOU COULD SEE WITH THE BLUE ICONS ARE THE RAISED CROSSWALKS AND THE RAISED CROSSWALKS. THESE ARE ALL AT WHAT WE CALL UNCONTROLLED APPROACHES OR MID-BLOCK CROSSINGS. SO THIS DOES HELP PROVIDE A SAFE AREA FOR PEDESTRIANS TO CROSS WHILE ALSO TRAFFIC CALMING TRAFFIC.

AND THEN WE'LL GET INTO A FEW DESIGN UPDATES. SO WE DID PRESENT TWO DIFFERENT OPTIONS FOR THE FIRST AVENUE SOUTH AND 10TH STREET INTERSECTION DURING THE CONCEPTUAL PHASE. THE ORIGINAL DIRECTION WAS TO MOVE FORWARD WITH A SINGLE LANE ROUNDABOUT. ONCE WE GOT INTO THE DESIGN, WE REALIZED THAT THE LIFT STATION ON THE SOUTHWEST CORNER WOULD BE IMPACTED BY THE HORIZONTAL GEOMETRY OF THE ROUNDABOUT. WE QUICKLY NOTIFIED STAFF MET ON SITE, AND IT WAS DETERMINED TO MOVE FORWARD WITH A RAISED INTERSECTION TO NOT IMPACT THE LIFT STATION, WHICH WAS RECENTLY CONSTRUCTED. SO FOR THE 60% DESIGN PLANS THAT WERE SUBMITTED, WE DO HAVE A RAISED INTERSECTION. WE ALSO DID REVIEW A ALWAYS STOP CONDITION, REVIEWING CRASH DATA AND THE VOLUME OF TRAFFIC GOING THROUGH THIS INTERSECTION, AND WE ARE PROPOSING TO KEEP THIS INTERSECTION AN EXISTING TWO WAY STOP CONTROLLED INTERSECTION, WHICH IS HOW IT EXISTS TODAY. SO ONCE WE REALIZED THE ROUNDABOUT DIDN'T WORK AT 10TH AND FIRST, WE SAT DOWN WITH STAFF AND REVIEWED DIFFERENT INTERSECTIONS WHERE WE MAY BE ABLE TO HAVE THAT OPPORTUNITY FOR A ROUNDABOUT AND IDENTIFIED 12TH STREET SOUTH AND FIRST AVENUE SOUTH. BUT WITH THIS INTERSECTION, WHEN WE LAID OUT THE THE ROUNDABOUT, WE WERE CONSTRAINED WITH THE RIGHT OF WAY AND REALIZED THAT WE WOULD HAVE TO ACQUIRE ADDITIONAL RIGHT OF WAY TO FIT THIS IN. SO WE SAT DOWN WITH ALL THE PROPERTY OWNERS TO TRY TO MAKE THIS WORK. ULTIMATELY, IT WAS NOT FEASIBLE. SO WE ARE MOVING FORWARD AGAIN

[00:20:02]

WITH THAT INTERSECTION THAT WAS SHOWN IN THAT PREVIOUS SLIDE. THE LANDSCAPE DESIGN. SO WHAT YOU SEE ON THIS SLIDE IS THE LANDSCAPE PALETTE PLANT PALETTE THAT WAS PRESENTED TO THE PUBLIC. THE PROPOSED LANDSCAPING THAT WAS INCLUDED IN THE 60% DESIGN IS CONSISTENT WITH THIS GOING THROUGH THE DIFFERENT CORRIDORS. SO 10TH STREET SOUTH. SO THIS IS THAT AREA WHERE WE'RE DOING UTILITY AND DRAINAGE IMPROVEMENTS. AGAIN, WE'RE JUST REPLACING WHAT'S THERE TODAY. AS WE GO NORTH ON 10TH STREET, WE'RE GOING TO TRY TO MAINTAIN THE EXISTING LANDSCAPING ON THE EAST SIDE WHERE WE'RE NOT IMPACTING IT, AND THEN ADD THE LANDSCAPING ON THE WEST SIDE, NORTH IN THAT RESIDENTIAL AREA. WE ARE PROPOSING TO REPLACE THE ROYAL PALMS THAT ARE IMPACTED WITH ROYAL PALMS AND THEN FIRST AVENUE SOUTH AND 12TH STREET SOUTH. THAT RIGHT OF WAY IS FULLY BEING IMPROVED, SO THAT WILL BE ALL NEW LANDSCAPING ON THOSE CORRIDORS. SOME CHALLENGES WE WE HAVE WITH THE LANDSCAPING DESIGN. SO ON FIRST AVENUE SOUTH, WE HAVE POWER POLES AND POWER LINES ON THE NORTH SIDE ON 10TH STREET, POWER LINES ON THE WEST SIDE, AND THEN 12TH STREET POWER LINES ON THE EAST SIDE. SO THAT DOES PROVIDE SOME CHALLENGES AS FAR AS LARGE CANOPY TREES AND TREES THAT GROW A LITTLE TALLER.

SO THAT IS SOMETHING WE'RE WORKING THROUGH. AND THEN WE'VE ALSO SAT DOWN WITH THE DESIGN DISTRICT. ONE TIME AFTER THE CONCEPT PHASE, WE WILL BE SITTING DOWN WITH THEM IN THE FUTURE JUST TO TALK THROUGH DIFFERENT IDEAS THEY HAVE. AFTER WE RECEIVE COMMENTS BACK FROM CITY STAFF TO WORK THROUGH, AS WE PROGRESS TO 90%, MAKING SURE THAT, YOU KNOW, WHEN WE CAN COORDINATE AND INCLUDE THINGS THAT THEY WOULD LIKE TO SEE THAT WE'RE INCLUDING IN THE PLANS. SO FROM A STORMWATER PERSPECTIVE, AGAIN, THE MULTI BASIN DRAINAGE PROJECT, WE DID COORDINATE WITH THE CITY'S CONSULTANT ON THIS. WHAT WE IDENTIFIED WAS THERE WAS IMPROVEMENTS SHOWN ON CENTRAL AVENUE. SO THIS IS WITHIN THE AREA D. AND WHEN WE IDENTIFIED THAT WITH CENTRAL AVENUE SOMEWHAT RECENTLY BEING RECONSTRUCTED IN THE PAST TEN YEARS, AND US FULLY RECONSTRUCTING FIRST AVENUE SOUTH, WE COORDINATED POTENTIALLY BRINGING THAT TRUNK LINE TO FIRST AVENUE SOUTH. WE ALL THOUGHT IT WAS A GOOD IDEA.

SO THAT'S HOW WE MOVED FORWARD WITH ADDING IT TO THIS PROJECT. THERE WERE A COUPLE DIFFERENT SCENARIOS IN THAT MULTI BASIN DRAINAGE ASSESSMENT PROJECT. THERE WAS IMPROVEMENT ALTERNATIVES WHICH WERE PROPOSED FOR PROJECTS TODAY, WHICH IS WHAT WE'RE MOVING FORWARD WITH. AND THEN THEY ALSO REVIEWED THE LONG RANGE ALTERNATIVES, WHICH INCLUDED SEA LEVEL RISE OVER 70 YEARS. SO THAT WAS INCLUDING 20 YEARS TO GET THE IMPROVEMENTS IN THE GROUND BASED ON THEIR THEIR MULTI BASIN ASSESSMENT AND THEN 50 YEARS OF DESIGN LIFE OF THAT INFRASTRUCTURE. ONE THING I DO WANT TO NOTE. SO WITH THIS PROJECT, THEY DID IDENTIFY 272 INCH PIPES GOING DOWN GOODLETTE. AND THAT FUTURE LONG TERM ALTERNATIVE. THEY DID HAVE PUMP PUMP STATION AT THIS LOCATION. THAT WAS BECAUSE THE SEA LEVEL RISE WENT HIGHER THAN THE EXISTING ROADS TODAY. AND THIS IS A TIDALLY INFLUENCED AREA. SO A PUMP IS NOT INCLUDED IN THIS PROJECT. IT IS JUST THE TWIN 72 INCH PIPES WHICH WE'LL GET INTO FUTURE, ALONG WITH THE TRUNK LINE, SHIFTING IT FROM CENTRAL AVENUE TO FIRST AVENUE SOUTH FROM A BASIN IMPROVEMENT PERSPECTIVE. SO THE EXISTING CONDITION. SO EVERYTHING YOU SEE IN BLUE TODAY IS DRAINING.

AND THIS ALSO INCLUDES AN AREA WEST OF US 41 THAT GOES TO THE PUBLIC WORKS PUMP STATION THAT DISCHARGES TO THE GORDON RIVER. THE RED AREA IS THE NAPLES SQUARE AREA THAT CURRENTLY DRAINS TO THE EXISTING OUTFALL THAT WE ARE GOING TO BE IMPROVING WITH THIS PROJECT. SO THAT MIDDLE IMAGE SHOWS AFTER OUR PROJECT IS COMPLETE AND CONSTRUCTED, WE'RE RELIEVING SOME OF THE THE BASIN AREA THAT'S CURRENTLY GOING TO THE PUBLIC WORKS PUMP STATION BY APPROXIMATELY 18 ACRES. AND THEN WE'RE ADDING APPROXIMATELY 23 ACRES TO THE OUTFALL THAT IS CURRENTLY WHERE NAPLES PARK IS DISCHARGING TO. THE DISCREPANCY IN ACREAGES. I'LL GET INTO THE NEXT SLIDE, BUT THERE IS A DOUBLE BENEFIT WITH THIS PROJECT. OBVIOUSLY, WE'RE TAKING MORE AND IMPROVING THE INFRASTRUCTURE WHERE WE ARE DISCHARGING TO, BUT WE'RE ALSO TAKING THINGS AWAY FROM THE PUBLIC WORKS PUMP STATION. AND THEN THE IMAGE ON THE FAR RIGHT.

SO THIS IS THE ULTIMATE ONCE ALL THE IMPROVEMENTS WITHIN AREA D ARE CONSTRUCTED. AND I DO WANT TO NOTE THE FIFTH AVENUE NORTH PROJECT. IT IS BUDGETED UNDER THE CRA. SO THAT AREA IN GREEN WILL COME ONLINE ONCE THE INFRASTRUCTURE ON FIFTH AVENUE SOUTH IS DESIGNED AND CONSTRUCTED. AND THEN THE OUTFALL ON THE FAR NORTH WITH THE LITTLE STAR THERE IS IMPROVED. SO FROM AN UNDERGROUND PERSPECTIVE OF THE IMPROVEMENTS. SO THAT

[00:25:05]

DISCREPANCY IN ACREAGES EARLIER. SO CURRENTLY THERE'S A PORTRAIT PORTION OF 10TH AVENUE SOUTH ON THE SOUTH SIDE THAT DRAINS TOWARDS US 41. WE'RE TAKING THAT AND WE'RE NOW TAKING THAT AND FLOWING IT NORTH TO OUR OUTFALL. THIS WAS ONE OF THE AREAS THAT WAS IDENTIFIED IN THE PROJECT WHERE THERE IS SOME NUISANCE FLOODING THERE. THE CHALLENGING PORTION ABOUT THIS IS THE ROAD ELEVATION IS ABOUT THREE, WHICH IS PRETTY LOW BECAUSE IT IS A TIDAL OUTFALL, THE TAIL WATER OF WHEN WE'RE MODELING THIS, WE'RE USING ABOUT 1.5 TO 1.9 INCHES. SO THE ELEVATION DIFFERENCE IS PRETTY SMALL. BUT WITH THE IMPROVEMENTS WE ARE TAKING THAT TO OUR OUTFALL. AND AS YOU CAN SEE, THE EXISTING TRUNK LINES WITHIN OUR PROJECT, THERE'S QUITE A FEW THAT ARE EITHER 15IN OR SMALLER. AND THEN THERE'S ALSO A 36 INCH PIPE THAT EXTENDS FROM CENTRAL AVENUE TO FOURTH AVENUE NORTH. BUT IN THIS NEXT SLIDE, YOU'LL SEE THE INFRASTRUCTURE THAT WE'RE PROPOSING WITH THIS PROJECT. THIS IS JUST THE TRUNK LINE. AND WE DO HAVE THREE DIFFERENT OUTFALLS. SO AS WE'RE GOING DOWNSTREAM TO AN OUTFALL, THE PIPES INCREASE IN SIZE. BUT THE IMPORTANT THING IS, YOU SEE THERE ARE NO PROPOSED TRUNK LINE PIPES THAT ARE 15IN IN DIAMETER. THE MINIMUM SIZE IS 18IN, WHICH IS THE FAR UPSTREAM OF EACH BASIN AREA. AND THEN ON FIRST AVENUE SOUTH, YOU CAN SEE THAT PURPLE LINE. SO THAT'S THAT 72 INCH PIPE THAT WAS ORIGINALLY SHOWN ON CENTRAL AVENUE. WE'RE DOWN TO FIRST AVENUE SOUTH. AND THEN GOING ALONG GOODLETTE ORIGINALLY, THE MULTI BASIN ASSESSMENT STUDY IDENTIFIED 2072 INCH PIPES GOING DOWN GOODLETTE. ONCE WE STARTED REVIEWING THIS FROM A DESIGN STANDPOINT, WE REALIZED THAT THERE'S QUITE A BIT OF VERTICAL DIFFERENCE OF THE EXISTING GROUND WHERE THE GULF SHORE PLAYHOUSE IS. AND THEN ALSO WITH THE NEW BUILDING GOING IN. SO WE REALLY WANTED TO KEEP THE FOOTPRINT OF THE TRENCH TO A BARE MINIMUM AS WE AS WE COULD. SO WHEN WE GOT INTO THE DESIGN, WE SWITCHED IT TO A SIX BY NINE BOX CULVERT, EXTENDING ALL THE WAY DOWN, WHICH ALLOWS US TO KEEP IT A LITTLE TIGHTER. THIS IS ALL WITHIN THE 30 FOOT DRAINAGE EASEMENT, BECAUSE THERE ARE SOME CHALLENGES IN THE AREA WITH THE VERTICAL DIFFERENCE AND ALSO SOME POWER LINES AND THINGS LIKE THAT. THERE'S A LOT GOING ON IN THAT DRAINAGE EASEMENT. WE ARE PROPOSING SHEET PILE WALLS TO BE DRIVEN IN BEFORE THE INSTALLATION OF THE BOX CULVERT. BUT YOU CAN SEE ULTIMATELY IT DOES DISCHARGE ACROSS GOODLETTE. AND AGAIN, THAT STORMWATER CHECK VALVE IS WOULD BE ON THE FAR LEFT SIDE BEFORE THE BOX CULVERTS BEGIN. DID YOU SAY YOU HAD YOU HAD NEW PIPES ON GOODLETTE OR THERE'S JUST NOT ANYTHING SHOWN IN COLOR ON THAT ONE PLAN? THE ONE. YEAH. SO THE ONE BEFORE THIS ONLY WE ARE PROPOSING THE BOX CULVERT. SO THAT THAT WAS JUST THE REPRESENT THE PIPES. OKAY, I GOT YOU. SO ON GOODLETTE THIS SLIDE THAT I'M SHOWING RIGHT NOW, IF YOU LOOK TO THE LEFT, THAT'S NORTH. SO WE DO HAVE A SIX BY NINE BOX CULVERT EXTENDING ALL THE WAY DOWN SOUTH CROSSING GOOD LAKES. CORRECT. YEP. IT'S A IT'S EQUIVALENT TO 272 INCH PIPES. OUR RECOMMENDED RECOMMENDED PHASING APPROACH FOR CONSTRUCTION. WE DO HAVE, AS I MENTIONED BEFORE, THREE DIFFERENT OUTFALLS. SO WE WOULD RECOMMEND PHASING THIS BY OUTFALL. THERE COULD BE SUBPHASES WITHIN EACH PHASE.

AND ON PREVIOUS PROJECTS WE WORKED WITH THE CITY ON, WE DID ALLOW THE CONTRACTOR TO SHUT OFF BLOCK BY BLOCK, WHICH ALLOWED THEM TO EXPEDITE THE CONSTRUCTION A LITTLE BY NOT HAVING TO MAINTAIN TRAFFIC THROUGH THE WORK ZONE. SO THAT IS SOMETHING WE WOULD RECOMMEND WITH THIS PROJECT AS WELL. BUT YOU CAN SEE EVERYTHING HIGHLIGHTED IN YELLOW WOULD BE THE GULET OUTFALL. SO THIS IS THAT NEW OUTFALL. THIS IS ALL THE IMPROVEMENTS THAT WOULD BE DRAINING TO THAT. THE RED WOULD BE THE INFRASTRUCTURE THAT WOULD BE DRAINING TOWARDS THE PUBLIC WORKS PUMP STATION. AND THEN THE GREEN IS THE INFRASTRUCTURE THAT WOULD BE GOING TO MANOR LAKE. SO THE PATH FORWARD. YEP. SO THE GREEN. SO THAT'S THE NORTHERN PORTION ON 10TH STREET THAT ALL FLOWS TO THE L SHAPED LAKE MANOR LAKE AND DISCHARGES THERE. SO THE PATH FORWARD AND THE ANTICIPATED SCHEDULE SO PERMITTING. SO THAT IS ONGOING.

WE'RE ANTICIPATING ONCE WE GET COMMENTS BACK FROM THE CITY ON THE 60% DESIGN SUBMITTAL, WE WILL BE SUBMITTING TO BOTH THE SOUTH FLORIDA WATER MANAGEMENT DISTRICT AND THE ARMY CORPS OF ENGINEERS. WITHIN TWO WEEKS, WE HAD PRE-APPLICATION MEETINGS WITH BOTH OF THEM WITH THE CORPS. THERE ARE SOME IMPACTS AT THE OUTFALL, SO THAT WILL BE A NATIONWIDE PERMIT IS WHAT WE'RE ANTICIPATING. WE WILL BE ALSO PERMITTING THROUGH FDEP FOR THE UTILITY IMPROVEMENTS

[00:30:03]

FOR THE PROJECT FDOT, WE'RE TYING INTO THEIR RIGHT OF WAY IN THREE DIFFERENT LOCATIONS.

SO WE'LL BE PERMITTING THAT ONE OF THE MORE CHALLENGING PERMITS THAT WE'LL HAVE TO OBTAIN IS WITH COLLIER COUNTY, BECAUSE WE ARE INSTALLING A BOX CULVERT UNDERNEATH ONE OF THEIR MAIN ARTERIALS, WHICH IS GOOD. SO THERE'S GOING TO BE PRETTY HEAVY COORDINATION WITH THE COUNTY, AND THEN WE WILL BE PRESENTING THE RECOMMENDATIONS AND DISCUSSION THAT WE HAVE TODAY TO THE CRA IN JUNE, WITH A 90% DESIGN SUBMITTAL ANTICIPATED FOR AUGUST 100% IN NOVEMBER. THE BID PACKAGE TO THE CITY WOULD GO JANUARY AND THEN CONSTRUCTION WOULD BEGIN IN 2027. SO WITH THAT, WE OPEN UP ANY QUESTIONS? OKAY. THANK YOU VERY MUCH FOR THAT PRESENTATION. VERY, VERY INFORMATIVE. BUT THIS TIME WE WILL ENTERTAIN QUESTIONS FROM OUR BOARD MEMBERS. LET'S START DOWN HERE WITH OUR NEWEST MEMBER, MR. LEE. SO I NOTICED OBVIOUSLY THERE'S SOME RECONFIGURATION OF ON STREET PARKING. IS THERE GOING TO BE A NET INCREASE OR DECREASE IN THE AVAILABLE PARKING? SO THIS WAS A COORDINATED PRETTY HEAVILY THROUGH THE CONCEPTUAL PHASE. SO FOR THE ENTIRE PROJECT AREA, BECAUSE YOU HAVE THE PERPENDICULAR PARKING ON 10TH STREET AND IT'S BEING REMOVED TO PARALLEL PARKING, OVERALL, THERE IS A NET DECREASE OF 45 PARKING SPOTS. AND THAT'S BROKEN DOWN BY 12 SPOTS ON FIRST AVENUE SOUTH BECAUSE THERE IS SOME PERPENDICULAR PARKING THERE AS WELL. THERE'S 36 SPOTS ON 10TH STREET. AND THEN WE'RE ACTUALLY ADDING THREE SPOTS ON 12TH. BUT WITH THAT BEING SAID, THE EAST PARKING GARAGE DID ADD 365 SPACES AND THEN A NEW PARKING AREA ON THIRD AVENUE NORTH ADDED 24. BUT SPECIFICALLY FOR THE PROJECT, IT WOULD BE 45 SPACES BEING REMOVED. GO RIGHT AHEAD. SO LOOKING AT YOUR YOUR TIMELINE YOU HAVE HERE, ASSUMING THAT, YOU KNOW, SEPTEMBER 2026 DOESN'T HAPPEN WITH ALL YOUR PERMITS, WILL YOU STILL BE ABLE TO MEET THAT JANUARY 2027 BID PACKAGE SUBMITTAL DATE? YEAH. SO WE'RE WE'RE FAIRLY CONFIDENT WITH THE PERMITTING. WE'RE GOING IN WITH A GENERAL PERMIT FOR THE IMPROVEMENTS ON THE DISTRICT SIDE. AND THEN WITH IT BEING A NATIONWIDE WERE THE WETLANDS WERE IMPACTING IS 0.02 ACRES. THERE ARE, YOU KNOW, ONCE YOU OBVIOUSLY YOU'RE VERY WELL KNOWN TO THIS. ONCE YOU SUBMIT THE PERMITS, YOU YOU OPEN YOURSELF UP. SO IF THERE'S NOTHING FROM A FEDERAL LEVEL THAT GETS BROUGHT UP, WE'RE CONFIDENT THAT WE CAN MAINTAIN THAT SCHEDULE. BUT YEAH, UNFORESEEN THINGS AT THE FEDERAL LEVEL COULD CERTAINLY THROW US A CURVE BALL. THANK YOU. FIRST, I'D LIKE TO WELCOME LEE. IT'S A PERFECT MEETING FOR HIM TO BE AT, CONSIDERING HE'S A CIVIL ENGINEER. SO GLAD HE'S HERE AND DEFINITELY BRINGS SOME GREAT SOME GREAT INSIGHT TO TO THE BOARD. IS THERE A WAY THAT WE COULD GET A SET OF THE PLANS EMAILED TO US SO THAT WE CAN LOOK AT THOSE AT SOME POINT TO JUST KIND OF PERUSE A LITTLE DEEPER IF WE WANTED TO. YEAH, I'LL BE HAPPY TO PROVIDE A LINK TO THEM. THEY'RE LARGE PLANS, SO IT'S HARD TO DISTRIBUTE, BUT I'LL, I'LL MAKE THEM AVAILABLE THROUGH A LINK. OKAY, TERRIFIC.

AND IN THOSE PLANS, WAS THERE, WERE THERE PHOTO METRICS FOR THE SITE LIGHTING? THE LIGHTING PLANS DID NOT INCLUDE PHOTO METRICS AT THE 60% STAGE, BUT THEY WILL BE IN THE FUTURE.

THEY WILL BE OKAY. THAT THAT WOULD BE SOMETHING I'D LOVE TO SPECIFICALLY COME BACK TO US TO LOOK AT IS THE PHOTO METRICS AND MAKING SURE, YOU KNOW, LIGHTING IS JUST SO IMPORTANT FROM AN ESTHETIC AND A SAFETY PERSPECTIVE. SO IF WE COULD, IF WE COULD LOOK AT THAT, THAT'D BE TERRIFIC. LET'S SEE. THE SECTION FOR THE RAISED. SO THERE WAS GOING TO BE A ROUNDABOUT AT 10TH AND FIRST AND THEN 12TH AND FIRST, AND NOW IT'S A RAISED INTERSECTION.

DO YOU HAVE A SECTION ON THAT THAT YOU CAN SHOW US JUST SO WE CAN KIND OF UNDERSTAND WHAT THE LIKE, HOW RAISED IT IS OR HOW IT HOW IT KIND OF LOOKS AND FEELS. YEAH. SO THE, THE VERTICAL IMPROVEMENTS WILL BE SIX INCHES. AND SO AS YOU APPROACH THE INTERSECTION,

[00:35:02]

THERE IS A TRANSITION, OBVIOUSLY TO GO UP. AND THEN AS YOU CAN SEE ON YOUR SCREEN RIGHT NOW, I GUESS VERTICALLY, IT'S IT'S KIND OF HARD TO SEE, BUT THE IMAGE ON THE LEFT IS WHAT THAT'S REPRESENTING. OKAY. YEAH. BECAUSE IT JUST DIDN'T LOOK WHEN I SAW THAT PICTURE, DIDN'T LOOK LIKE IT'S RAISED MUCH. IT LOOKS PRETTY FLAT, BUT IT IS A DIFFERENT MATERIAL AS WELL TO THEN. RIGHT. EXACTLY. YEAH. SO IT'LL, IT'LL ACT AND FEEL A LITTLE DIFFERENT ONCE, ONCE YOU GET THERE. AND THEN ONCE, ONCE YOU GET UP, WHAT'S NOT INCLUDED IN THIS PICTURE THAT YOU'LL SEE IN THE PLANS WE ARE PROPOSING BOLLARDS AROUND BECAUSE WHERE THE PEDESTRIANS ARE CROSSING AT THOSE FLAT AREAS, THAT WILL BE ACCURATE TO THE INTERSECTION. SO OBVIOUSLY, WE WANT TO MAKE SURE THAT, YOU KNOW, AN ERRANT VEHICLE THAT THE PEDESTRIANS WOULD BE PROTECTED, WHERE WOULD THE BOLLARDS BE? SO THEY WOULD GO AROUND. I FORGOT I HAVE. DID THEY GET THE CORRECT RADIUS? YEAH, YEAH, THEY'RE RIGHT AROUND THE CURB RADIUS. OH OKAY.

ON THE CURB THERE. OH, THERE WE GO. THEY'D BE LIKE RIGHT AROUND HERE. OKAY, GREAT. ANY. LIKE LIGHTING ACTIVATION WITHIN ANY OF THE INTERSECTION, IMPROVEMENTS FOR PEDESTRIAN CROSSINGS OR IN THE INTERSECTIONS? SO WE, WE ARE PROPOSING THE RAPID RECTANGULAR FLASHING BEACONS AT. THERE'S IMPROVEMENTS ON CENTRAL AVENUE AT 12TH STREET. SO THE FAR NORTH END OF 12TH, WE ARE IMPROVING THAT. WE'RE PROVIDING A REFUGE ISLAND WITHIN AREA FOR PEDESTRIANS TO CROSS AND AS WELL AS THE. THE NORTH SOUTH CROSSING CROSSING CENTRAL AVENUE. GOTCHA. OKAY. GREAT. THANK YOU. AND ONE OF THE DISCUSSIONS THE CRA AND CRA ADVISORY BOARDS HAD FOR A WHILE IS THE, THE ALLEY ACTIVATION PROJECT CAN I DON'T KNOW IF THAT'S A YOU SPEAK TO THAT OR ANITA SPEAKS KIND OF HOW IT ALL DOVETAILS IN WITH WITH THIS BECAUSE I KNOW THAT WAS THE SORT OF THE NOT MAYBE NOT DELAY, BUT WAITING TO KIND OF SEE HOW THIS ALL LOOKS AND FEELS BEFORE THAT GETS MOVING FORWARD. YEAH. SO THE, THE DESIGN WALK PROJECT, THE PILOT PROJECT THAT'S LOCATED WEST OF 10TH BETWEEN FIRST AVENUE SOUTH AND CENTRAL AVENUE. THAT PROJECT WILL GO WITH THE FIRST AVENUE SOUTH IMPROVEMENTS BECAUSE THERE IS A WATER LINE THAT NEEDS TO BE REPLACED BETWEEN CENTRAL AND FIRST AVENUE SOUTH, THAT YOU DON'T NECESSARILY SEE THAT THAT LEVEL OF DETAIL HERE, BUT THAT THAT'S WHAT WHEN WHEN WE CONSTRUCT THAT FIRST AVENUE SOUTH, THAT LINE WILL BE PUT IN ON THAT WESTERN ALLEYWAY. AND THEN WE CAN, WE CAN GO FORWARD WITH THE DESIGN WALK PROJECT AND AT WHAT DESIGN POINT DOES THAT HAPPEN? IS IT 60%, 90%, 100%? LIKE IT HAS TO BE 100% DESIGN. YOU THINK BEFORE THAT ALLEY ACTIVATION STARTS OR, OR BEFORE THE, I GUESS THE ACTUAL PROJECT MOVES FORWARD. SO THE DESIGN OF THAT THE PILOT PROJECT WAS ACCEPTED BY THE CRA BOARD. IT HAS BEEN ACCEPTED. SO WE HAVE BEEN ALIGNING THE CONSTRUCTION OF THAT PROJECT WITH THE FIRST AVENUE SOUTH PROJECT WITH THE ACTUAL PHYSICAL CONSTRUCTION. OKAY. I WAS THINKING THERE WOULD NEED TO BE A DESIGN. WELL, I'M SURE THERE'S SOME DESIGN THAT STILL NEEDED, BUT OKAY, THAT THAT MAKES SENSE. THANK YOU. AND THEN IS THERE ANY MAYBE IT'S MORE OF A CONTRACTOR QUESTION, BUT ON THE PHASED AREAS, DO YOU HAVE TIMELINES ON HOW LONG THOSE ARE ANTICIPATED TO BE TO TAKE FOR EACH OF THE PHASED AREAS BROKEN DOWN AT A PHASE LEVEL? WE DON'T AT THIS TIME.

YEAH. GREAT. THANK YOU. HI. THANKS FOR THE PRESENTATION. VERY DETAILED. JUST A COUPLE QUESTIONS FOR ME. ONE, YOU SAID YOU WERE GOING TO HAVE SOME CHALLENGES WITH THE OUTFALL BY MANGROVE BAY. WHAT CHALLENGES WOULD THOSE BE? SO THOSE ARE PRETTY SUBSTANTIAL DRAINAGE IMPROVEMENTS WITH THE BOX CULVERT GOING IN. AND IF YOU'RE FAMILIAR WITH THE AREA, IF YOU JUST ON THE NORTHERN END, WE'LL START IN THE NORTH AND COME DOWN. THE GULFSHORE PLAYHOUSE IS SUBSTANTIALLY HIGHER, AS WELL AS THERE IS AN EXISTING POWER LINE. SO WE'RE GONNA HAVE TO COORDINATE WITH FPL, WHICH ALL THAT UTILITY COORDINATION IS PART OF. AFTER THE 60% DESIGN PHASE. SO IT'S NOT A CHALLENGE WITH DISCHARGING INTO THE CANAL. IT'S A CHALLENGE WITH GETTING TO THE CANAL CONSTRUCTION. OKAY. YEAH. AS FAR AS GETTING TO THE CANAL,

[00:40:06]

IT'S WHAT YOU SAW IN THE EXHIBIT. YEAH. I SEE THE, THE LITTLE YELLOWS GOING DOWN INTO LOOK LIKE MANGROVE BAY AREA THERE. SO WHAT YOU SEE THERE, THAT'S FROM THE 60% PLANS THEMSELVES. SO THEY DON'T HAVE PAGE NUMBERS. THE PROJECT LIMITS PROJECT RECAP WHERE YOU'RE SHOWING THE BLUE RED GREEN DRAIN AND THE LITTLE YELLOW OUTFALL THERE. WAS THERE ANY RESEARCH DONE INTO THAT CANAL THAT YOU'RE DISCHARGING INTO THE STORMWATER, THE VERY END WHERE YOU GOT THE YELLOW? YEAH, CROSSING GOODLETTE INTO THAT CANAL. WHAT KIND OF IS THERE? IS THERE NO CHALLENGES TO DISCHARGE INTO THAT? SO THE, THE MULTI BASIN ASSESSMENT KIND OF REVIEWED THIS AREA. AND THERE IS AN EXISTING PIPE THAT DISCHARGES THERE RIGHT NOW.

OKAY. THE DRAINAGE EASEMENT ON THE WEST SIDE PROVIDED AN OPPORTUNITY FOR THIS LOCATION.

BUT AS FAR AS THE DIRECT CHALLENGES. I'M NOT AWARE. WAS THERE ANY STUDIES DONE? YES.

WE'VE RUN HYDRAULIC MODELS. OH REALLY? FOR THIS AREA. OH, NICE. THANK YOU. AND THAT'S WHERE THE CHECK VALVE GOES. SO THE DRAINAGE CHECK VALVE WITH A BOX CULVERT IS DIFFICULT. AND SO THE THE CHECK VALVE IS ACTUALLY JUST UPSTREAM OF THE BOX CULVERT WHERE THE 72 INCH PIPE IS. YEAH. WHERE COULD I SEE THESE STUDIES, DAN. THERE'S THE MULTI BASIN BASIN FOR REPORT DONE BY KIMLEY-HORN. AND WE HAVE OUR TECHNICAL MEMORANDUM ALONG WITH THIS PROJECT. AND IT HAD THAT OUTFALL PIPE ALREADY ASSESSED. IT'S IN TERMS OF FLOWS. YEAH WE'VE BEEN ASSESSING THE FLOWS. OKAY. THANK YOU. ALSO I THINK IT WAS FIRST IN 10TH STREET. YOU SAID YOU HAD SOME SOME TROUBLE BECAUSE OF POWER LINES IN THE WAY. IS THERE ANY WAY WE COULD JUST BURY THIS, OR ARE WE NOT THINKING ABOUT BURYING POWER WHEN WE'RE GOING TO REDO THIS, THIS STREET AND WE'RE GOING TO HAVE IT ALL DUG UP ANYHOW? SO THE THE CHALLENGE WITH THE FIRST AND 10TH, I BELIEVE WITH THE ROUNDABOUT WAS A LIFT STATION, BUT WITH THE POWER LINES. AS WE REACH OUT TO FPL, THAT WILL BE PART OF THE COORDINATION. SO YOU ARE GOING TO TRY AND BURY THEM OR WE'RE CERTAINLY GOING TO BRING THAT UP TO THEIR ATTENTION. BUT I KNOW ON PREVIOUS PROJECTS WITH OTHER MUNICIPALITIES, THE COST WILL BE BACK ON THE CITY TO UNDERGROUND THEM, WHICH COULD INCREASE THE COST SIGNIFICANTLY. OKAY. THANK YOU. THANK YOU, THANK YOU FOR THAT. VERY DETAILED NOT A CIVIL ENGINEER. SO I STAY THAT WHILE I ASK THESE QUESTIONS, LOOKING AT THE THE 60% PLAN STRUCTURE. 34 IS THAT CURRENTLY THERE OR IS THAT AS PART OF. I'M ON PAGE 19. ALL RIGHT. ALL RIGHT THERE. BOTTOM LEFT. SO THERE'S AN EXISTING STRUCTURE THAT'S THERE RIGHT NOW. IT WILL BE REPLACED BECAUSE THE INFRASTRUCTURE GOING INTO IT. AND THAT'S WHERE THE 72 INCH PIPE IS RUNNING INTO THAT STRUCTURE AREA AND THEN GOING INTO THE BOX CULVERT. SO THE CHECK VALVE IS GOING TO BE KIND OF RIGHT IN THAT LOCATION. YEAH, JUST BEFORE THAT BOX. YEAH. AND SO THE BOX CULVERT THEN NOW ONCE AGAIN, NOT A CIVIL ENGINEER. DOES THAT BECOME IF IT'S RISING TIDE AND THE WATER IS GOING TO BE SITTING IN THAT BOX CULVERT. OKAY. CORRECT. OKAY, COOL. JUST WANT TO CLARIFY ON THAT. AND THEN THE CHECK VALVES GO BEFORE THAT. OKAY, INTERESTING. THE POWER LINES ON FIRST, I DON'T KNOW WHERE THEY'RE AT. THEY'RE ON THE SOUTH OR THE NORTH SIDE. THEY'RE ON THE NORTH. OKAY.

THAT'S BETTER. SO WE COULD HAVE SHADE ON THE SOUTH SIDE. SHADE TREES ON THE SOUTH SIDE, CORRECT. YEAH. THERE THERE'S UTILITY IMPROVEMENTS AS WELL. OKAY. THE GRAVITY MAINS BEING RECONSTRUCTED AS WELL AS THE THE WATER MAIN. BUT THE INTENT IS TO KEEP THAT GREEN SPACE OPEN WHERE WE CAN PUT CANOPY TREES. OKAY. AND I JUST WANTED TO ADD THAT WE WILL CONTINUE TO LOOK AT HOW WE CAN IMPROVE SHADE ALONG THE CORRIDOR AS WE GET TO THE 90% PLANS. OKAY, PERFECT. AND THEN CONSTRUCTION, I SEE HERE, IT LOOKS LIKE IT'S PLAYING IN THE 27. IS THE GOAL TO HAVE THAT DURING AN OFF SEASON? BECAUSE PHASING WISE, I MEAN, YOU'VE GOT GOOD LIT.

YOU'VE GOT AREAS HERE WITH THE PLAYHOUSE. IS THAT THE GOAL OR IS IT JUST WE KNOW THAT FAR AHEAD OF TIME YET. THAT'S GOING TO BE A CONVERSATION WITH THE CITY. UNDERSTOOD. AND AND THEN I MEAN, THIS IS THERE'S THAT NEW. SO THIS BOX CULVERTS GOT TO GO UNDERNEATH ALL THE EXISTING SIDEWALK. AND THAT WHOLE THING IS GETTING TORN UP AND ACROSS AND THEN ACROSS.

GOODLETTE TO. CORRECT. CORRECT. OKAY. I MEAN, A LOT OF. YEAH, THAT'S GOING TO BE CHALLENGING.

[00:45:02]

WHAT DO YOU SEE? THE BIGGEST OBSTACLE IS WITH PERMITTING WISE, PROBABLY COORDINATING WITH COLLIER COUNTY, REALLY THE, THE RIGHT OF WAY PERMIT. YEAH. BECAUSE WHEN YOU'RE GOING ACROSS AN ARTERIAL, PHASING IT IN A WAY, I'M SURE THEY DON'T WANT TO SHUT DOWN GOODLETTE FOR THE AMOUNT OF TIME IT'S GOING TO TAKE TO CROSS IT. SO IT'LL BE A PLAN AND A DISCUSSION.

OKAY. AND YOU WERE SAYING, I KEEP COMING BACK TO THIS. SO YOU'RE SAYING THAT YOU MODELED EVERYTHING. SO WHEN THAT BOX CULVERT FILLS UP FROM A BIG STORM, WHAT HAPPENS THEN? THE WATER JUST THAT'S WHEN IT STARTS TO COME. SO THE CHECK VALVE WILL STOP IT. OKAY. IT WON'T GO UPSTREAM OF THAT BOX THAT YOU WERE REFERRING TO. YEAH. AND THEN AS IT GOES DOWN, IF IT DOES STORM, WHEN TIDE'S COMING UP, THE CHECK VALVE OPENS. IT'S LIKE A DUCKBILL AND THE HEAD WILL PUSH IT OUT. BUT THAT'S ALL INCLUDED IN THE MODEL. YEAH. AND WHAT'S THE WHAT IS THE GOAL OF HAVING LIKE THAT BIG OF A STORM SYSTEM RIGHT THERE? IS THAT SO WHEN THE TIDE RISES, IT CAN TAKE IN SOME OF THE WATER OR IT COULD PUSH OUT FURTHER. SO THE SIZE OF THAT WAS BASED ON THE THE BASIN AREA ALL FLOWING TO THAT. YEAH. IT REALLY DOESN'T HAVE ANYTHING TO DO WITH STORING WATER WHEN IT'S HIGH TIDE. IT'S MORE OF THE MODELING OF THE PIPE SIZES. AGAIN, WE HAVE ELEVATIONS ON THE ROAD. SO AT FIRST AND 12TH ELEVATIONS ARE AROUND THREE. YEAH. AND THEN THAT SOUTH SIDE OF 10TH ELEVATION IS THREE. SO THE PIPE SIZES GET BIGGER BECAUSE YOU YOU DON'T HAVE THAT ELEVATION DIFFERENCE AT A TIDAL OUTFALL THAT YOU WOULD LIKE TO SEE FOR WATER TO GET OUT. SO THAT'S WHY THE INFRASTRUCTURE WAS SO LARGE.

ALL RIGHT. THANK YOU. THANK YOU. GREAT PRESENTATION. THANK YOU. VERY INFORMATIVE. SO LOOKING TOWARDS THE FUTURE, SEEING THAT THE LEVEL OF THE STREET DOWN SOUTH OF FIRST GOES DOWN TO THREE FEET, IS THAT GOING TO BE SUSTAINABLE FOR THE FUTURE? LIKE LOOKING AT LIKE REALISTICALLY LOOKING AT THIS, WHAT WE'RE DOING RIGHT NOW IS GOING TO BE, I MEAN, THIS IS LIKE A, AN ADEQUATE SOLUTION FOR THE TIME BEING. BUT AS TIDE LEVELS RISE AND WITH THAT SIX BY NINE CULVERT THAT YOU WERE MENTIONING, IT'S A 72 INCH PIPE FLOWING INTO THAT, IS THAT TRULY GOING TO BE ADEQUATE ENOUGH TO HANDLE THE WATER SUPPLY? BECAUSE IT IS A LOWER POINT. SO, I MEAN, MOST OF THE WATER IS GOING TO BE FLOWING THROUGH THERE. LIKE THAT'S A HUGE AMOUNT OF WATER. DO YOU FEEL LIKE WITHOUT A PUMP THAT'S GOING TO BE ADEQUATE? SO BASED ON THE MULTI BASIN ASSESSMENT, AGAIN, THEY LOOKED AT THAT FUTURE CONDITION WHICH WAS 70 YEARS OUT WHERE THEY INCLUDED THE PUMPS BECAUSE OF THE SEA LEVEL RISE. YOU KNOW, WE WE'VE MODELED THIS PRETTY EXTENSIVELY. WE ACTUALLY TOOK THE MODEL THAT WAS DONE WITH THE MULTI BASIN.

WE COORDINATED WITH THEIR CONSULTANT. WE THEN BROUGHT IT INTO MORE OF A DESIGN PHASE BECAUSE THAT WAS MORE OF A CONCEPTUAL LEVEL. AND BASED ON THAT MODELING, IT IS. AND, AND THE 72 INCH THAT'S GOING INTO THE BOX CULVERT. SO THE BOX CULVERT IS EQUIVALENT TO 272 INCH PIPES. OKAY. SO, OKAY, IT'S JUST BECAUSE OF THE AMOUNT OF RAIN THAT I'VE SEEN THAT ACCUMULATES IN THAT AREA. AND EVEN SOUTH OF THERE, IT JUST BECOMES A LAKE ITSELF. SO I'M WONDERING, IS THAT GOING TO HELP ALLEVIATE ALL OF THAT ENTIRE AREA, OR IS THIS JUST GOING TO BE FOR THIS PARTICULAR ROAD? BECAUSE DOES IT ALL DRAIN INTO THIS? SO. THE IMPROVEMENTS YOU SEE IN YELLOW. SO ALL THAT WILL THE ROADWAY AND WHAT'S FLOWING TO THE ROADWAY WILL DRAIN THROUGH THE SYSTEM WE'RE PROPOSING. AND THE NEW OUTFALL. AND THERE'S NO POSSIBILITY OF ADDING PUMPS TO THESE DESIGNS AT ALL. THERE'S. NOT NONE AT THIS JUNCTURE. SO THESE THIS WILL BE A MAJOR STORMWATER IMPROVEMENT IN ITS OWN RIGHT TO HELP PREPARE US FOR FUTURE AND THE INTENSE STORMS OF THE FUTURE BEYOND 50 YEARS. AT SOME LEVEL, IT'S IT'S SOMETHING THAT FUTURE PEOPLE CAN ANTICIPATE AND ADAPT. BUT THIS WILL DEFINITELY PREPARE OUR THIS NEIGHBORHOOD FOR THE FUTURE. OKAY. THANK YOU. GREAT. THANK YOU. ANY ADDITIONAL QUESTIONS? OKAY. GO RIGHT AHEAD. DO YOU HAVE A MODEL OR A MAP SHOWING KIND OF POST IMPROVEMENTS OF KIND OF WHAT THE THE GOAL IS OF WHAT IT OR MAYBE WHAT IT, HOW IT FLOODS NOW VERSUS HOW IT SHOULDN'T FLOOD ONCE IT'S ALL DONE, LIKE A INUNDATION MAP. THAT'S SOMETHING THAT WE CAN CERTAINLY PUT TOGETHER. AGAIN. THANK YOU. I JUST HAVE JUST 1 OR 2 QUESTIONS. ONE, ONE OF THE

[00:50:05]

THINGS IS THAT YOU MENTIONED THE FLOW GOING INTO MANOR LAKE. WILL THERE BE WORK DONE ON MANOR LAKE PRIOR TO THAT? NOT WITH THIS PROJECT, NO. OKAY. DO YOU ANTICIPATE ANY OVERFLOW OR ANY PROBLEM WITH THAT? SO FOR THAT PORTION OF THE PROJECT, THE IMPROVEMENTS FROM A PERVIOUS AND IMPERVIOUS PERSPECTIVE, IT'S EQUIVALENT TO WHAT'S OUT THERE TODAY. SO THE SAME AREA THAT'S DRAINING TO THE LAKE IS GOING TO BE DRAINING TO THE LAKE IN THE POST-CONDITION. OKAY. AND ALSO THE PERMITTING PHASE ACCORDING TO YOUR SCHEDULE, APRIL 2026 IS WHEN YOU STARTED. SO YOU'VE ALREADY STARTED PERMITTING. YES, MA'AM. OKAY. WHAT STAGE ARE YOU? SO WE ARE PREPPING THE APPLICATIONS FOR THE SOUTH FLORIDA WATER MANAGEMENT DISTRICT SUBMITTAL AND ARMY CORPS. AND THEN WE'RE COORDINATING WITH CITY STAFF ON THE 60% SUBMITTAL. AND ONCE WE COORDINATE ON THEIR REVIEW OF THAT, WE DON'T WANT TO SUBMIT THAT AHEAD OF THAT. ONCE WE THEY DON'T OR AHEAD OF THEIR REVIEW BEING COMPLETE, JUST IN CASE SMALL THINGS CHANGE. SO ONCE WE GET THEIR COMMENTS BACK WITHIN A WEEK OR TWO, DEPENDING ON THE COMMENTS, THOSE APPLICATIONS WILL GO IN. OKAY. ALL RIGHT. DO YOU ANTICIPATE WHEN YOU GO BEFORE CRA IN JUNE, JUNE 11TH, DO YOU ANTICIPATE ANY CHANGES OR ANYTHING THAT WILL DELAY YOUR PERMITTING AND SET EVERYTHING BACK? I DO NOT BELIEVE SO. I THINK IT'S GOING TO FLOW PRETTY WELL. OKAY. AND THE PROBLEM WITH THE COLLIER COUNTY PERMITTING, I DO KNOW IT TAKES A A LOT TO GET THROUGH, COLLIER COUNTY PERMITTING. IS THAT SOMETHING THAT YOU'RE GETTING READY TO START NOW OR ARE YOU GOING TO WAIT? I MEAN, I THINK DELAYING IT WOULD MAKE IT EVEN THAT MUCH LONGER WHEN YOU ALREADY KNOW IT'S GOING TO TAKE A LONG TIME. YEAH, I'M, I WOULD SAY CHALLENGE INSTEAD OF PROBLEM. YEAH. WE ARE GOING TO WE ACTUALLY REACHED OUT TO THEM AT THE CONCEPTUAL LEVEL TO BEGIN THE CONVERSATION. BUT NOW THAT WE HAVE PLANS THAT HAVE BEEN SUBMITTED, WE WILL CERTAINLY BEGIN THAT DISCUSSION FOR THE RIGHT OF WAY PERMIT TO CROSS. WE ARE NOT GOING TO WAIT. OKAY. SO DO YOU SEE ANYTHING THAT WE COULD DO AS A BOARD THAT COULD HELP WITH THIS? NOT AT THIS TIME. OKAY. THANK YOU. CHAIR, I HAVE ANOTHER QUESTION.

GO AHEAD. SO IS THAT SIDEWALK? COLLIER COUNTY'S UNDER THE CULVERT. SO I BELIEVE I WOULD HAVE TO LOOK AT THE THE EASEMENT ITSELF. I KNOW, SO THERE'S A THERE'S A PARKS AND DRAINAGE EASEMENT WITHIN THAT 30 FOOT AREA. OKAY. BUT IF IT'S DIRECTLY ADJACENT TO THE CURB, WHICH I'D HAVE TO GO AND LOOK, IT'S MOST LIKELY WITHIN THEIR RIGHT OF WAY. OKAY. YEAH. IS THERE ANY OTHER QUESTIONS? OKAY. WE HAVE NO ADDITIONAL QUESTIONS AT THIS TIME. I'M EXCITED THAT YOU ARE AT THE 60%. WE'VE BEEN WAITING FOR YOU FOR A WHILE. SO I'M VERY HAPPY THAT YOU'VE REACHED THAT STAGE, AND I LOOK FORWARD TO YOUR 90% SUBMITTAL. AND GOOD LUCK WITH COLLIER COUNTY. AND IF THERE'S ANYTHING THAT WE CAN DO TO ASSIST, PLEASE LET US KNOW. THANK YOU VERY MUCH. THANK YOU, THANK YOU. OKAY. THIS TIME WE HAVE NEW BUSINESS. WHICH IS BASICALLY

[8.A) Discussion of the draft FY 2027 CRA Capital Improvement Projects and Recommendations to the CRA Board.]

GOING TO START CAPITAL IMPROVEMENT. WE'RE STARTING CAPITAL IMPROVEMENT EARLY ENOUGH BECAUSE SOMETIMES WE HAVE TO GO BACK AND FORTH A LITTLE BIT. SO I'M GOING TO TURN THIS OVER TO ANITA. LET HER GET US STARTED. ANITA. YES THANK YOU, MADAM CHAIR. WE WILL BE DISCUSSING TODAY THE THE DRAFT AND PRELIMINARY CAPITAL IMPROVEMENT PROGRAM FOR NEXT YEAR. AND WE BEGIN THIS THIS PROCESS EARLY IN THE YEAR IN FEBRUARY. SO LET ME JUST PULL THIS PRESENTATION UP AND AND WE'LL GET STARTED ON SOME INFORMATION FOR YOUR CONSIDERATION. LET'S SEE. THERE WE GO. SO EACH YEAR THE THE CRA PREPARES A CAPITAL IMPROVEMENT PROGRAM AND A BUDGET TO SHOW THAT AFTER OUR EXPENSES, ALL OF OUR FUNDS ARE APPROPRIATED TO A

[00:55:04]

SPECIFIC PROJECT AND THAT THESE PROPOSED PROJECTS OR PROGRAMS ARE CONSISTENT WITH OUR REDEVELOPMENT PLAN. SO WHEN WE GET INTO THE FINAL BUDGET, WE WILL HAVE A PRESENTATION TO SHOW HOW EACH PROJECT IS CONSISTENT WITH THE REDEVELOPMENT PLAN ITSELF. SO THIS YEAR, IN MARCH 3RD, THE CRA HAD A REPRIORITIZATION DISCUSSION. AND THIS STEMMED FROM A EARLIER MEETING IN IN WHICH THE CRA BOARD WISHED TO CONSIDER OTHER PROJECTS AND THEIR PRIORITIES. SO IN THE MARCH MEETING, THAT DISCUSSION WAS ONGOING. AND WHAT YOU SEE REFLECTED IN THE AMENDED BUDGET ON THE LEFT COLUMN REFLECTS THE PRIORITIES AS WELL AS THE PRELIMINARY CAPITAL IMPROVEMENT PROGRAM FOR NEXT YEAR AND THE FOLLOWING YEARS THAT WE HAVE ON THIS TABLE. SO THE CRA BOARD. KNOWING THAT THE FIRST AVENUE, 10TH STREET AND 12TH STREET PROJECT WAS NOT GOING TO BE UNDER CONSTRUCTION THIS YEAR, WE MOVED THOSE FORWARD THAT THAT FUNDING THAT WAS IN THERE FOR THIS YEAR. WE MOVED IT FORWARD TO NEXT YEAR. THE NAPLES DESIGN DISTRICT IMPROVEMENTS, THE DESIGN WALK PILOT PROJECT THE SAME. WE KNEW THAT FIRST AVENUE WOULD NOT BE UNDER CONSTRUCTION THIS YEAR. AND SO THOSE FUNDINGS WERE MOVED FORWARD. WE DID LEAVE SOME FUNDS IN THERE FOR THE 1/70 10TH STREET PROPERTY PROJECT. MOVING FORWARD, THE REMAINING PROJECTS UNDER THERE ARE ONGOING. THE ON FIFTH AVENUE SOUTH AND SUGDEN PLAZA. THE CRA DID RECEIVE A PRESENTATION FROM KIMLEY-HORN, WHO HAS BEEN SELECTED AS THE DESIGN CONSULTANT FOR FIFTH AVENUE SOUTH. THEY PROVIDED THE CRA BOARD INFORMATION ON A GRANT OPPORTUNITY THAT THEY FELT WAS A VERY GOOD FIT FOR THE CITY OF NAPLES. SO DURING THAT MEETING, BY CONSENSUS, THE CRA BOARD GAVE STAFF DIRECTION TO MOVE FORWARD WITH SEEKING THAT GRANT OPPORTUNITY. SO THAT IS IN THEIR CONSENSUS. IT WAS TO SPEND THE MONEY THAT WE HAD BUDGETED TO BEGIN DESIGN ON SEEKING THAT GRANT UP TO THAT AMOUNT. THE OTHER PROJECTS THIS YEAR IN THIS AMENDED BUDGET ARE PRIMARILY COMPLETE, OR THEY HAVE REQUISITIONS ALREADY ENTERED FOR THEM. SO WE ARE JUST, FOR INSTANCE, WAITING ON THE DELIVERY OF THE LANDSCAPE TRUCK OR PART OF THE ANTHONY PARK PROJECT IS FORTHCOMING TO BE PRESENTED TO THE CRA. AND IN ADDITION, THE THE MAIN DISCUSSION WITH THE CRA BOARD CENTERED AROUND RIVER PARK EAST AND THEY PROVIDED STAFF DIRECTION TO DO A FULL INFRASTRUCTURE RENEWAL PROJECT IN RIVER PARK EAST. SO THAT SHIFTED THE MAJORITY OF THE FUNDS OUT INTO 2728 WITH DESIGN KEPT THIS YEAR. SO THE REQUEST FOR PROPOSALS IS UNDER REVIEW AT THIS TIME FOR RIVER PARK EAST AND THAT FULL INFRASTRUCTURE RENEWAL PROJECT.

AND THAT WOULD INCLUDE STORMWATER UTILITIES AND STREETS AND RIVER PARK EAST, THE MULTI BASIN PROJECT THAT WAS IDENTIFIED IN DANIEL'S PRESENTATION OF FIFTH AVENUE NORTH. IF YOU'LL RECALL THE THE GREEN AREA IN HIS PRESENTATION OF THE THE BASINS THAT PROJECT FOR FIFTH AVENUE NORTH AND SIXTH AVENUE NORTH IN THE RIVER PARK WEST IS STILL UNDER. IN THIS AMENDED BUDGET FOR DESIGN AS WELL, THE. THE CRA ALSO PROVIDED THROUGH CONSENSUS DIRECTION TO STAFF TO PARTNER WITH THE CITY TO PROVIDE SAFETY IMPROVEMENTS AROUND CAMBIER PARK AND INSTALLING PLANTERS AND BOLLARDS AROUND CAMBIER PARK. AND SO WE'LL BE LOOKING AT THAT MOVING FORWARD THIS YEAR. SO WE'LL GO THROUGH A LITTLE BIT MORE ABOUT HOW OUR PROJECTS LOOK THEN AND WHAT THE CIP LOOKS LIKE FOR THE FOLLOWING YEAR. YOU CAN SEE

[01:00:04]

THAT WE HAVE A BUDGET OF APPROXIMATELY 228, 50 MILLION FOR NEXT YEAR, AND THE MAJORITY OF THAT IS FOR THE CONSTRUCTION OF FIRST AVENUE, SOUTH 12TH STREET AND 10TH STREET IMPROVEMENTS. WE ALSO HAVE THE. NAPLES DESIGN DISTRICT IMPROVEMENTS NEXT YEAR, AND ALSO FIFTH AVENUE SOUTH AND SUGDEN PLAZA IMPROVEMENTS STARTING WITH THE DESIGN OF THAT. IF WE'RE SUCCESSFUL WITH THAT GRANT OPPORTUNITY. AND THEN WE ALSO HAVE IN OUR BUDGET MAINTAINED $250,000 TO CONTINUE WITH THE NEIGHBORHOOD PLANS PROJECTS. SO EACH PROJECT YOU JUST RECEIVED, THE DETAILED PRESENTATION FROM THE CONSULTANT ON THE FIRST AVENUE, 12TH STREET AND 10TH STREET PROJECT. SO THIS WE WILL GO AHEAD AND FUND THE ENTIRE CONSTRUCTION AGREEMENT IN ONE CONTRACT. AND THIS IS SUBJECT TO CHANGE. THE AMOUNT IS OF 18.5 MILLION. AS WE GET TO THOSE FINAL NUMBERS, WITH OUR CONSTRUCTION AGREEMENTS GOING FORWARD. THE CRA WILL BE FUNDING THE STREETSCAPE PORTIONS AND AS MUCH STORM WATER AS WE HAVE FUNDS AVAILABLE TO. THIS ONE WAS ALSO MENTIONED IN THAT PRESENTATION.

MR. SCHUCHART ASKED ABOUT THE DESIGN PILOT PROJECT. AND AGAIN, THAT IS PROGRAMED TO START WITH THE FIRST AVENUE SOUTH PROJECT CONSTRUCTION. SO WE HAVE THAT IN THE BUDGET, AND THEN WE HAVE THE DESIGN, THE ENGINEERING DESIGN SERVICES FOR FIFTH AVENUE SOUTH AND SUGDEN PLAZA.

WE ARE NEGOTIATING THAT AGREEMENT AND THAT THAT GRANT SUBMITTAL FOR THAT. SO WE HAVE RETAINED THE THE FUNDING FOR THAT DESIGN WHILE WE'RE SEEKING THE GRANT FUNDS FOR CONSTRUCTION TO SUPPORT THAT AND FUTURE YEARS. AND THEN FINALLY, IN THE UPCOMING BUDGET CAPITAL IMPROVEMENT PROGRAM, WE HAVE 250 000 PROGRAM FOR THE NEIGHBORHOOD PLANS PROJECTS.

AND THAT IS SOMETHING THAT WE WILL BRING BACK TO YOU TO DISCUSS WHAT PROJECTS WE HAVE REMAINING IN THE NEIGHBORHOOD PLANS, AND THEN HAVE RECOMMENDATIONS OF WHAT PROJECT WILL GO FORWARD WITH NEXT YEAR. SO THIS IS WHAT, AGAIN, IN THE YELLOW, WHAT IS DEFINED IN THE DETAILS THAT WE JUST WENT FORWARD WITH FOR NEXT YEAR? SO YOU CAN SEE THAT WE HAVE, AGAIN, OVER $22 MILLION BUDGETED FOR NEXT YEAR IN CONSTRUCTION PROJECTS, WITH THE MAJORITY OF OUR PROJECTS BEING IN INFRASTRUCTURE FOR THE CRA IN THE FOLLOWING YEARS. SO WITH THAT, I'M HAPPY TO ANSWER ANY QUESTIONS THAT YOU HAVE. AT THIS TIME. I'M CURIOUS TO KNOW, WITH, I THINK THE DESIGN THAT THEY'RE COMING UP WITH IS FORWARD THINKING, AND I'M 100% IN AGREEMENT WITH THAT. BUT WHAT ARE WHAT IS I DON'T EXACTLY KNOW IF THE CRA IS IN CHARGE OF THIS, BUT FOR THE FUTURE BUILDING AND WHAT IS HAPPENING, LIKE, FOR INSTANCE, THEM HAVING TO REVISE THE TYPE OF. YOU KNOW, PIPES THAT THEY'RE USING BECAUSE THINGS HAVE ALREADY BEEN BUILT OUT. AND I AND. ARE THERE PLANS IN PLACE TO LIKE HOLD SOME OF THE DEVELOPERS ACCOUNTABLE FOR, YOU KNOW, I GUESS UPGRADING THEIR AREAS AS WELL, WHAT THEY'RE CONTRIBUTING BECAUSE BY PUTTING MORE VOLUME INTO THE SYSTEM, I FEEL LIKE WE MISSED THE OPPORTUNITY TO HAVE THEM RESPONSIBLE FOR UPGRADING SOME OF THOSE INFRASTRUCTURES FOR THEIR IMMEDIATE NEEDS, YOU KNOW, AND AS A RESULT, THE CITY HAS TO WORK AROUND AND TRY AND FIND OTHER SOLUTIONS, YOU KNOW, TO, I GUESS, KEEP UP OR NOT DESTROY WHAT THEY'VE ALREADY BUILT. BUT I FEEL LIKE IT SHOULD BE THE OTHER WAY AROUND. I THINK THAT WE SHOULD BE HOLDING THESE BIG

[01:05:01]

DEVELOPMENTS, LIKE WHAT'S COMING UP HERE, THE AVENUE, YOU KNOW, WHAT ARE THEY GOING TO DO TO HELP IMPROVE THE SITUATION? BECAUSE IT'S GOING TO BE A VERY I MEAN, THAT'S A VERY BUSY AND VERY FLOOD PRONE AREA. SO I GUESS THAT WOULD BE MY QUESTION. SO EACH, EACH DEVELOPMENT THAT IS APPLICATION THAT COMES FORWARD TO THE CITY BUILDING DEPARTMENT, PLANNING DEPARTMENT, TRANSPORTATION, STORMWATER PUBLIC WORKS DEPARTMENT GOES THROUGH RIGOROUS DESIGN REVIEW PROCESSES TO MEET OUR CODES. SO RELATED TO STORMWATER THERE, EACH PROJECT HAS TO MEET THE STORMWATER CODE THAT IS DICTATED BY THE CITY. SO THEY THEY HAVE TO ADDRESS THE STORMWATER ON THEIR PROPERTY THAT THAT MEETS THE CODE. SO SO THAT IS ONGOING. EACH TIME A PROJECT COMES IN, IT IS EVALUATED TO TO MEET THE CODE THAT IS IN PLACE AT THE TIME.

AND THEN I HAVE A QUESTION REGARDING. THE. FOR THE FUTURE PLANNING IS THERE. I SEE THAT FOR THE 2728 BUDGET, THERE'S THE 22 MILLION ON FOR. AND THE 5 MILLION FOR RIVER PARK WEST AND EAST. IS THERE NO DESIGN A BUDGET FOR THAT OR HOW DOES THAT WORK? IS THAT ALREADY IN DESIGN? SO THE DESIGN IS IS THIS YEAR. SO WHEN YOU LOOK AT THAT PROJECT, YOU SEE THE 2 MILLION FOR STREETS AND STORMWATER IMPROVEMENTS. AGAIN, THE THE CRA WILL FUND STREET IMPROVEMENTS, BEAUTIFICATION IMPROVEMENTS, STORMWATER IMPROVEMENTS, AND THEN THE THE CITY IS OUR PARTNER IN IMPROVING UTILITIES AND STORMWATER WHEN NEEDED. SO THOSE ARE PARTNERSHIPS. SO THE THE DESIGN FOR THOSE PROJECTS ARE IN THIS YEAR'S BUDGET. AND THAT WAS A REPRIORITIZATION OF DIRECTION FROM THE CRA BOARD IN MARCH. OKAY. THANK YOU. AND THANK YOU. THE ADDITIONAL 1.1 FOR FIFTH AVE SOUTH. THAT'S BASED ON RESPONSES FROM OUR RFP.

YES. THAT'S CORRECT. OKAY. YES. AND IF I'M UNDERSTANDING THIS CORRECTLY, WE'RE BASICALLY EARMARKING 18.5 FOR THESE IMPROVEMENTS WHEREVER THEY MAY LAND, LANDSCAPING, LIGHTING, STORMWATER, WHEREVER THEY CAN HELP, THE CRA IS GOING TO BE PUTTING UP THAT JUST AS THEY WOULD FOR RIVER PARK EAST AND WEST. YES. SO SO THE 18.5, THAT NUMBER WAS BASED ON A CONCEPTUAL COST ESTIMATE THAT WAS PROVIDED TO US LAST YEAR TO TRY TO GIVE US SOME SENSE OF MAGNITUDE FOR OUR BUDGETING PROCESSES FOR THE CRA. SO AS THE DESIGN PROGRESSES AND TIME CONTINUES, WE CAN ANTICIPATE THOSE COSTS MAY CHANGE. SO AT THIS TIME, WE HAVE THAT BUDGET OF OVER 18 MILLION FOR STORMWATER AND STREET IMPROVEMENTS IN THAT PROJECT.

THE UTILITIES WILL BE PAID BY THE UTILITY DEPARTMENT. UTILITY FEES. THANK YOU. JUST A QUICK QUESTION. AS FAR AS THE I SEE 750 FOR THE ANTHONY PARK IMPROVEMENTS ON THE PLAYGROUND.

IF. HAS THE 750 ALREADY BEEN. YOU KNOW WHAT I MEAN? HAVE WE HAVE WE LOOKED AT THE PLAYGROUND EQUIPMENT AND SAID, IT'S 750 OR ARE WE JUST LIKE PUTTING THAT. 750 THERE SO THAT WE HAVE ENOUGH TO GET THE EQUIPMENT? OR DO WE KNOW THAT IT'S 750? THAT'S A BUDGET ALLOCATION, AN APPROPRIATION. AND THEN WHEN THE PARKS AND RECREATION COMES BACK WITH PROPOSALS FOR THAT, THE, THE, THE FEES WILL BE REVEALED THEN MORE ACCURATE. OKAY. NOW LET'S SAY IT COMES IN AT 500. DOES THE 250 REMAIN IN THAT PARK OR DOES IT GO BACK INTO THE KITTY? IT GOES BACK INTO OUR OVERALL FUND. AND THAT WOULD BE THE SAME WITH THE BOLLARDS ON. WHAT IS IT? CAMBIAR THAT'S 500. I WAS JUST ON MY PHONE LOOKING A BALL. YOU'RE THE MOST EXPENSIVE STAINLESS ONE I COULD FIND WAS 250 BUCKS. HOW MANY BOLLARDS DO WE NEED? DO WE KNOW HOW MANY IS REQUIRED? NO. AGAIN THAT'S AN APPROPRIATION. AND AS THAT PROJECT IS DESIGNED, WE'LL HAVE A BETTER IDEA ON THE COST OF THAT. SO IT'S JUST A ROUGH SWING THEN IS THE 500 TO MAKE SURE YOU'RE COVERED. ALL RIGHT. THANK YOU. THANK YOU FOR THIS. THERE'S OBVIOUSLY A LOT OF GOOD

[01:10:04]

WORK GOING ON IN THE BUDGET AND THIS YEAR AND YEARS TO COME. SO ONE OF THE THINGS THAT I KIND OF STRUGGLE WITH A LITTLE BIT WITH THIS IS I SEE THE EXPENSE SIDE, BUT I'D LOVE TO SEE THE REVENUE SIDE JUST, YOU KNOW, NORMAL, YOU KNOW, KIND OF A PROFIT AND LOSS BUDGET JUST SO WE CAN UNDERSTAND, YOU KNOW, WHAT WE'VE, WHAT WE'RE PLANNING TO BRING IN. SURE. AND NOT JUST FOR 2025 AND 26, BUT EVEN MAYBE GOING FORWARD, I THINK IT WOULD JUST BE HELPFUL TO KIND OF PAINT THE WHOLE PICTURE OF, YOU KNOW, WE'VE SPENT, YOU KNOW, WE'RE GOING TO, WE'RE GOING TO BRING IN 15 AND SPEND 22. BUT, YOU KNOW, JUST WE DIDN'T SPEND AS MUCH LAST YEAR. AND SO JUST HELPS THIS HELPS ME UNDERSTAND A LITTLE BETTER WHAT KIND OF WE'RE WE'RE DOING. SO, SO THE REVENUE SIDE IS BASED ON OUR AD VALOREM TAXES, AS YOU ALL ARE AWARE, WITHIN OUR CRA BOUNDARY.

AND THAT IS SUBJECT ALWAYS TO CHANGE BASED ON THE MILLAGE RATES AND ANY OTHER CHANGES THAT MAY COME FROM THE STATE DEALING WITH AD VALOREM TAXES. SO IN THE IN THE PAST YEAR, WE GENERATED APPROXIMATELY $11,000 IN AD VALOREM, ABOUT 11 MILLION. YES. I'M SORRY, 11 MILLION. AND WE'RE IN TROUBLE. 11 MILLION. AND ABOUT 70% OF THAT IS FROM COLLIER COUNTY THAT MAINTAIN OR REMAINS WITHIN THE CRA. AND ABOUT 30% OF THAT IS FROM THE CITY TAXES THAT ARE RETAINED WITHIN THE CRA. SO WE'RE GENERATING IN REVENUES ABOUT 11000. WE SPEND ABOUT 3 MILLION IN OPERATING COSTS EACH YEAR FOR THE CRA. SO THAT LEAVES US ABOUT 7 MILLION TO BUDGET EACH YEAR FOR CAPITAL PROJECTS. WHEN WE DO NOT SPEND THE AMOUNT, WE REALLOCATE THAT WE HAVE TO DO THREE THINGS. WE EITHER HAVE TO REALLOCATE THAT THAT FUND THAT WE DIDN'T SPEND TO ANOTHER PROJECT. WE HAVE TO GIVE IT BACK TO THE TAXING AUTHORITY, OR WE HAVE TO PAY DOWN DEBT.

AND WE HAVE BEEN REALLOCATING IT TO OUR PROJECTS MOVING FORWARD AS HOW WE'VE BEEN APPROACHING IT THIS YEAR. SO WE ARE REALLOCATING THE FUNDS THAT WERE UNSPENT THIS YEAR TO NEXT YEAR. OKAY. IS THERE A WAY TO ADD THAT TO ANY TO OUR CAPITAL? I MEAN, JUST SO WE AGAIN, CAN HAVE THAT AS A REFERENCE POINT, OBVIOUSLY THERE'S SOME DISCLAIMERS AND YOU KNOW, THERE'S THINGS THAT COULD GO WITH IT. I JUST JUST BE HELPFUL TO SEE OF WHAT, YOU KNOW, KIND OF WHAT THAT WOULD BE, IF POSSIBLE. AND WHAT WAS THE AMOUNT OF THE GRANT POTENTIAL FOR THE FIFTH AVENUE, THE GRANTS ARE ALLOCATED UP TO 20 MILLION PER PROJECT. I THINK IT'S OVER 1 BILLION THAT THEY SET ASIDE FOR THESE ECONOMIC DEVELOPMENT ADMINISTRATION PROJECTS. IS THERE ANY OTHER GRANTS WE CAN SUBMIT BESIDES THAT ONE? SO WE HAVE BEEN LOOKING INTO THAT. WE LOOKED INTO ANOTHER GRANT CALLED THE BRICK GRANT. THAT'S ALSO A FEDERAL GRANT. BUT YOU NEED TO HAVE A STATE PARTNERSHIP THAT GOES THROUGH THE STATE TO DO THAT. AND AT THIS TIME, THEY HAD ELIMINATED THAT, THAT PROGRAM, BUT THEN THEY BROUGHT IT BACK. SO THE STATE HAS DECIDED THAT THEY WOULD ONLY INVITE BACK THOSE PROJECTS THAT THEY HAD ALREADY VETTED FOR LAST YEAR TO SUBMIT AGAIN THIS YEAR. SO WE DON'T HAVE AN OPPORTUNITY THIS YEAR TO SUBMIT FOR THE BRICK, BUT WE DO HAVE THE OPPORTUNITY TO SUBMIT FOR THE ECONOMIC DEVELOPMENT ADMINISTRATION GRANT. AND SO LOOKING FOR GRANTS IS SOMETHING THAT WE'RE ALWAYS INTERESTED IN TRYING TO TO FIND STATE AND FEDERAL FUNDS FOR. AND DOES THE CITY HAVE A FULL TIME GRANT PROCURING PERSON, OR IS IT JUST DOES IT FALL TO EACH INDIVIDUAL DEPARTMENT? IT'S GENERALLY BY EACH DEPARTMENT. YES. OKAY, GREAT. THANK YOU. I JUST WANT TO FOLLOW UP ON HIS THE GRANT. IS THAT CBGD OR WHAT? WHAT IS THE GRANT? IS THAT SOMETHING DIFFERENT? YEAH. SO THE CDBG GRANT IS SOMETHING DIFFERENT. THAT THAT IS A GRANT THAT IS ADMINISTERED BY COLLIER COUNTY. AND THAT IS ALSO A GRANT THAT WE APPLY FOR. AND IN FACT, TO GIVE YOU AN UPDATE ON THAT, THAT'S IN THE ADMINISTRATOR'S REPORT. BUT WITH THIS QUESTION, IT'S A GOOD TIME TO ANSWER THAT RIGHT NOW. SO WHEN YOU SEE THE PROJECT NUMBER HERE 26 C 13,

[01:15:09]

THE SAFETY ENHANCEMENTS FOR THE ANTHONY PARK AREA FOR $100,000. YES, WE DID SUBMIT A CDBG GRANT AND WE'VE RECEIVED NOTICE FROM THE COUNTY THAT WE ARE. THEY HAVE AVAILABLE FOR US $80,000.

SO THAT WILL OFFSET THE COSTS THAT WE HAD BUDGETED FOR THAT PROJECT. I I'M INTERESTED IN THAT C, THAT C, B, G, D OR WHATEVER IT WAS, BECAUSE I HAD A MEETING WITH THE MAYOR AND SHE HAD TOLD ME THE LAST TIME RIVER PARK EAST WAS ACTUALLY DREDGED, IT WAS DREDGED ALL THROUGH THAT FUNDING, THROUGH THAT, THOSE INITIALS WE JUST SAID, AND I WONDERED, IS THAT SOMETHING THAT WE COULD MAYBE ASK THE CRA TO LOOK INTO TO SEE IF MAYBE WE COULD GET THOSE CANALS DREDGED AGAIN THROUGH THAT? I THINK THAT QUESTION HAS BEEN ANSWERED BY THE CITY ATTORNEY AND THE ADMINISTRATION THAT DREDGING OF THOSE CANALS IS NOT UNDER THE CRA. OH, THAT'S UNDER THE CITY. YEAH. OKAY. BUT WOULD THAT BE THE SAME IF YOU GOT THE FUNDING? I'M SORRY, WITH THE FUNDING, WOULDN'T THAT MAKE IT THROUGH THE WOULDN'T THAT MAKE IT IN THE CRA. NO IT WOULD. IT'S AGAIN, YOUR YOUR FUNDING THAT'S AVAILABLE WITHIN THE CRA IS ALSO AVAILABLE. YOU'RE NOT JUST THE CRA. YOU'RE ALSO A CITY. RIGHT. SO SO THERE ARE SOME RESPONSIBILITIES THAT ARE ON THE CITY. THERE ARE SOME RESPONSIBILITIES THAT ARE ON THE CRA. THE POINT THAT IS, IS MOST IMPORTANT ABOUT THE CRA PROJECTS IS IT HAS TO BE IN THE REDEVELOPMENT PLAN. OTHERWISE YOU CANNOT EXPEND CRA FUNDS ON THOSE PROJECTS. ALL RIGHT. I'M DONE BEATING MY HEAD ON THAT BRICK. ALL RIGHT. THANK YOU. SO JUST A COUPLE QUESTIONS SPECIFICALLY AS IT RELATES TO THE 18.5 MILLION FOR THE IMPROVEMENTS. YOU KNOW, SAY THEY START GOING THROUGH THE PERMITTING PROCESS AND THAT NUMBER STARTS GROWING WITH MORE IMPROVEMENTS THAT THEY NEED TO DO TO GET ACROSS THE FINISH LINE. IS THAT 18.5 GOING TO CHANGE AT ALL BASED ON, SAY, THE 90% PLANS, OR IS THAT 18.5 PRETTY MUCH A CAP? LIKE THEY'RE NOT GOING TO GO OVER THAT AMOUNT. SO IF IF WE COME BACK WITH WITH A BUDGET THAT IS GREATER THAN THAT FOR THE ENTIRE PROJECT, THAT'S WHEN WE WILL TALK WITH OUR CITY MANAGER ABOUT HOW WE COVERED THOSE ADDITIONAL COSTS, WHETHER WE REPRIORITIZE AGAIN WITH THE CRA OR WE LOOK AT ADDITIONAL CITY FUNDING OR WE LOOK AT FINANCING. SO THERE'S ALWAYS OPPORTUNITIES TO TO LOOK AT DIFFERENT WAYS TO FUND A PROJECT. AND WE WOULD LOOK AT ALL THOSE THOSE MECHANISMS. IF IT COMES BACK GREATER THAN THAT FOR THE CRA PORTION. YEAH, GREAT. KIND OF A FOLLOW UP QUESTION. THE 18.5 IS THAT PURELY HARD CONSTRUCTION COSTS OR IS THAT INCLUDE SOFT COSTS SUCH AS PERMITTING IMPACT FEES, DESIGN FEES, KIND OF INCLUDES ALL OF THAT? YES. WELL, SOMETIMES THE THE PERMITTING FEES WERE PAID OUT OF THE CRA ADMINISTRATION FUNDS AS WELL.

BUT THOSE THOSE WOULD INCLUDE ALL THE HARD COSTS. ALL RIGHT. THANK YOU. ALL RIGHT. ANITA. SO ON OUR BUDGET RIGHT HERE THAT WE HAVE RIGHT HERE, THE AMENDED BUDGET FOR 2020 526. THIS IS WHAT WE'VE ALREADY APPROVED. CORRECT. THAT IS WHAT WAS DIRECTED WORKING ON NOW. SO RIGHT NOW WHAT WE'RE LOOKING AT IS 2627 RIGHT BUDGET. THE WHAT WHAT WE SHOW IN THE AMENDED BUDGET IS WHAT THE DIRECTION WAS FROM THE CRA BOARD IN MARCH. SO WHEN WE BRING BACK THE PRELIMINARY CIP, WE WANT TO MAKE SURE THAT WE ALWAYS INCLUDE ANY CRA BOARD DIRECTION THAT THE STAFF HAS RECEIVED. OKAY. SO. FOR OUR RECOMMENDATION PART. ON HERE, WE HAVE NEIGHBORHOOD PLAN PROJECTS. 2526 THERE'S NO NUMBER IN HERE, BUT I THOUGHT WE HAD A NUMBER SO THAT, IF YOU'LL RECALL, WE HAD THAT IN THERE. AND THEN WE IDENTIFIED THE NEIGHBORHOODS OF RIVER PARK EAST AND RIVER PARK WEST, AND WE DEFINED THOSE PROJECTS AS STORMWATER STREETS AND UTILITIES. OKAY. SO SO WHEN IT BECOMES IDENTIFIED, THEN WE, WE TRY TO IDENTIFY THE NEIGHBORHOOD AND, AND WHAT WE'RE DOING. SO WHEN IT'S JUST IDENTIFIED AS A NEIGHBORHOOD PLANS, PROJECTS, IT MEANS THAT WE'RE GOING TO LOOK BACK

[01:20:01]

THROUGH THAT PLAN. WE'RE GOING TO IDENTIFY THE PROJECT. AND AS WE DO THAT, THEN WE'LL CALL THAT OUT. OKAY. SO NOW SO I'M CLEAR. AND FOR WHAT WE NEED TO DO RIGHT NOW TO MAKE RECOMMENDATIONS, WE HAVE THE LINE ITEM STREET STORM WATER, SEVENTH AVENUE NORTH. THERE IS NO AMOUNTS PUT IN HERE. HOW DO WE GET AN AMOUNT PUT IN HERE? MAKE A RECOMMENDATION TO INCLUDE THAT IN THE BUDGET SO THAT ONE IS INCLUDED OUT IN 2030 31. OKAY. SO THEY'RE GOING TO PUSH THAT OUT THAT FAR. YEAH. AND THAT'S, THAT'S THE LIMITATION OF THE, THE FUNDING AVAILABLE. OKAY. NOW AFFORDABLE HOUSING, IT'S JUST DROPPED OFF THE MARKET, COMPLETELY DROPPED OFF THE BUDGET. WHAT HAPPENED WITH THAT? THAT WAS DISCUSSION AND A REPRIORITIZATION OF THE CRA BOARD. OKAY. SO THEY DECIDE TO ELIMINATE AFFORDABLE HOUSING COMPLETELY. THEY DECIDED THAT WITHIN THE NEXT COUPLE OF YEARS THAT THEY'RE GOING TO CONCENTRATE ON INFRASTRUCTURE PROJECTS. OKAY. SO THE IMPROVEMENTS THAT WAS NEEDED IN THE AFFORDABLE HOUSING PROJECTS THAT HAD JUST BEEN TERMINATED, OR THEY'RE NOT GOING TO DO THE IMPROVEMENTS, WHICH IMPROVEMENTS? REMEMBER, THERE WAS AN ITEM IN THERE, THE AFFORDABLE HOUSING TO MAKE DO THE RESILIENCE. BASICALLY THAT PART OF IT, THE GEORGE WASHINGTON CARVER APARTMENTS, WORKING WITH THAT PLAN TO HELP SUSTAIN THAT. AND IT WAS TALKING ABOUT DOING SOME RENOVATION WORK. IT WAS IT WAS QUITE A FEW DIFFERENT PROJECTS THAT WAS DISCUSSED AND THAT WAS IN THE WORKS THAT ALL OF A SUDDEN IT JUST FELL OFF THE CLIFF. AND I'M JUST WONDERING WHAT HAPPENED WITH THAT. ARE WE JUST NOT GOING TO DO THAT? WE'RE JUST GOING TO JUST KIND OF NOT MAINTAIN THESE PROJECTS ANY LONGER. SO THE, THE, AGAIN, THE RIVER PARK WEST AREA IS IDENTIFIED THIS YEAR FOR DESIGN WORK IN THE AMOUNT OF 725,000 TO IMPROVE STORMWATER ON FIFTH AVENUE NORTH AND SIXTH AVENUE NORTH. SO WE ARE WORKING WITHIN, YOU KNOW, THE PUBLIC REALM AND THE PUBLIC PROJECTS THAT WILL BENEFIT GEORGE WASHINGTON CARVER. AND THEN I AM AWARE OF THE THE MANAGEMENT AND THE LEASE OF OF GEORGE WASHINGTON CARVER. THEY ARE EVALUATING THOSE BUILDINGS NOW TO DETERMINE WHAT LEVEL OF IMPROVEMENTS THAT THEY WILL BE GOING FORWARD WITH, IF IT'S COSMETIC OR IF IT'S FULL REBUILD. SO THEY ARE EVALUATING THE ACTUAL BUILDINGS THEMSELVES. BUT THE CRA IS WORKING AGAIN TO IMPROVE THE INFRASTRUCTURE THAT SURROUNDS THAT AREA, INCLUDING 10TH STREET THAT YOU JUST HEARD ABOUT. AND THEN THIS YEAR WE HAVE THE DESIGN OF FIFTH. SO THE THE STORMWATER WILL CERTAINLY BE OF HELP TO THAT NEIGHBORHOOD. OKAY. AND SO WHAT DO WE NEED TO DO TODAY? IF YOU WOULD LIKE TO TODAY TO MAKE A RECOMMENDATION TO THE CRA BOARD TO RECOMMEND THE THE CIP AS PRESENTED, YOU'RE ABLE TO TO DO THAT TODAY. OR MAKE ANY OTHER SUGGESTIONS FOR CONSIDERATION. OKAY. SO AT THIS TIME, I WOULD LIKE TO GO TO MY BOARD MEMBERS AND SEE WHAT THEY HAVE IN MIND. LET'S START DOWN HERE WITH ME.

I'M IN FAVOR OF APPROVING IT AS A. JUST TWO OTHER QUESTIONS. THE HOME IMPROVEMENT PROGRAM, DOES THAT HAVE ITS OWN LINE ITEM OR IS THAT IN IN THE OPERATIONAL BUDGETS? IT'S IN THE OPERATING. OKAY. YES. NOT SURE IF IT MATTERS, BUT JUST FROM A PUBLIC PERCEPTION STANDPOINT, SINCE WE END UP, I FEEL LIKE WE LOOK AT THIS DOCUMENT MORE THAN ANYTHING. IT MAY BE GOOD TO HAVE IT ON THERE JUST TO SHOW THAT THAT'S PART OF OUR ONGOING, YOU KNOW, THINGS THAT WE'RE DOING. AND BECAUSE I THINK IT'S A GREAT PROGRAM AND, AND, YOU KNOW, JUST MAYBE FROM A PUBLIC PERCEPTION STANDPOINT, AND THEN IN OUR IN THE PRESENTATION FOR THE STORMWATER, I THOUGHT I HAD SEEN A NUMBER THAT WAS IN EXCESS OF THE 18.5. SHOULD WE RECOMMEND A NUMBER HIGHER THAN THE. 18.5 BEING THAT THE THE ENGINEER HAD SOMETHING HIGHER.

SO WHAT YOU SEE THAT MAY HAVE BEEN HIGHER FROM THAT WOULD BE THE UTILITIES PORTION. SO THIS

[01:25:03]

DOES NOT REPRESENT THE FULL CONSTRUCTION COSTS. OKAY. IT REPRESENTS JUST STREETS AND STORMWATER. OKAY. OKAY. GREAT. THANK YOU. AND AS FAR AS THE SHOWING THE THE HOME IMPROVEMENT PROGRAM, WE WILL BE COMING BACK TO YOU IN JUNE WITH THE FULL BUDGET. SO THIS IS AGAIN A PRELIMINARY DRAFT. AND ONCE WE UNDERSTAND YOUR RECOMMENDATIONS AND THE CRA GIVES US DIRECTION ON THE CAPITAL IMPROVEMENT, WE COME BACK WITH THE FULL BUDGET. AND THAT'S. WE'LL WE'LL SHOW YOU THE THE HOME IMPROVEMENT PROGRAM AND OTHER ITEMS THAT ARE IN THE OPERATING AS WELL. OKAY. AND WE'LL STILL HAVE A CHANCE TO, TO REVOTE ON IT WHEN YOU BRING IT BACK IN JUNE OR WHATEVER. OR WILL IT BE TOO LATE? THEN WE WILL BE BRINGING BACK THE FULL BUDGET IN JUNE. AND THEN THE THE CRA WILL ALSO DISCUSS THE CIP IN JUNE AND IN SEPTEMBER. THE FULL BUDGET WILL BE APPROVED BY THE CRA AND THEN FINALLY BY CITY COUNCIL IN SEPTEMBER. SO YOU WILL HAVE FURTHER OPPORTUNITIES FOR DISCUSSION IF YOU CHOOSE TO.

I'M IN FAVOR OF APPROVING IT AS IS. OKAY. I'D LIKE TO DOUBLE BACK ON WHAT CHRIS HAD SAID HERE. I THINK IT UNDERSTOOD THIS AS A CIP AND IT DOESN'T SHOW OUR OPERATING. BUT THIS IS A PUBLIC DOCUMENT THAT GOES OUT AND PEOPLE READ THE AGENDAS. IT'D BE NICE TO EVEN JUST. I DON'T EVEN KNOW WHERE ON THE BOTTOM SAY, YOU KNOW, CURRENTLY IN OPERATING COSTS, THAT IS A PROJECT THAT WE'VE TAKEN ON, RIGHT? THAT IS TOTALLY A PROJECT. AND MAYBE THERE ARE SOME OF THE COMMUNITY POLICING AND OTHER STUFF IS IN THERE AS WELL. BUT I THINK IT'S GOOD TO RECOGNIZE THAT BECAUSE IT STARTED AS A PROJECT THAT HAS MOVED INTO ITS LINE ITEM IN OUR BUDGET NOW 100%. SO THAT'S A GOOD SUCCESS FOR US. SPEAKING OF THE FOUR PROJECTS THAT ARE HIGHLIGHTED, THESE ARE ALL THINGS THAT WE'VE WORKED ON FOR A WHILE, EVEN SINCE BEFORE I WAS HERE. SO THE STORMWATER IMPROVEMENTS ALONG FIRST, 12TH AND 10TH, THAT'S GREAT TO HAVE IN THERE, THE NAPLES DESIGN DISTRICT IMPROVEMENTS. WE WERE TALKING ABOUT THAT BEFORE WE EVEN GOT ON THIS BOARD. WE'VE BEEN TRYING TO GET THAT FUNDED THE THE FIFTH AVE SOUTH THAT BEEN SUCKED IN. THAT WAS A TOP PRIORITY FOR YEARS NOW TO SEE THAT ON HERE AND ALLOCATING THE NECESSARY FUNDS FOR DESIGN, I THINK IS GREAT. AND THEN THIS PAST YEAR, WE TALKED ABOUT LOOKING AT THOSE NEIGHBORHOOD PLANS AND ALLOCATING MONEY TOWARDS THEM SOMEHOW. AND THAT'S IN THERE TOO. SO I JUST WANT TO SAY, THE FOUR PROJECTS THAT WE HAVE IN THERE ARE THINGS THAT WE'VE TALKED ABOUT AT LENGTH AND WE'VE AFFECTED, AND THEY'RE IN THERE. SO I'M HAPPY TO SEE THAT I'M IN SUPPORT OF THIS BUDGET. OKAY. THANK YOU. YES, I DEFINITELY CAN SEE THAT WE HAVE FOCUSED ON COMPLETING THE PROJECTS, AND THAT'S BEEN A PRIORITY FOR THE BOARD, I FEEL IS AND AGAIN, WITH THE PERCEPTION AGAIN, THE PUBLIC AND I HEAR IT, SOMETIMES THEY THINK THAT NOTHING'S GETTING DONE. AND I'M LIKE, NO, IT'S EVERY DAY SOMETHING'S GETTING DONE. AND IT'S JUST THAT PERCEPTION. I UNDERSTAND WHAT YOU'RE SAYING IS WHERE YOU WANT TO SEE IT. PERHAPS A SUGGESTION WOULD BE, IN ADDITION TO PUTTING UP THESE REPORTS, MAYBE ALSO ADDING THOSE OPERATING BUDGETS TO WHAT THE PUBLIC CAN SEE AT THIS TIME, BECAUSE THEY DO. WHEN YOU JUST SEE THIS, I THINK THEY UNDERSTAND THAT THIS IS ALL THAT'S HAPPENING, OR THEY'RE MAYBE NOT SEEING THE ENTIRE SCOPE OF EVERYTHING THAT'S GETTING DONE BY THE CRA. AND I THINK THAT'S WHERE THE MISCONCEPTIONS COME IN. BUT DEFINITELY, I THINK FOCUSING IT MORE LIKE THIS GIVES IT SO MUCH MORE POWER TO ACTUALLY COMPLETING THE PROJECTS AND GETTING THEM DONE. AND I'M REALLY LOOKING FORWARD TO THE NEXT YEAR BECAUSE I THINK THIS IS, YOU KNOW, JUST GREAT STEPS IN THE RIGHT DIRECTION. SO THANK YOU. AND I APPROVE THIS BUDGET AS IT IS. SO, MADAM CHAIR. OKAY. THANK YOU. YOU GOT ANOTHER QUESTION. I'LL MAKE A MOTION TO APPROVE THE 2627 CAPITAL IMPROVEMENT PROJECT.

BEFORE WE DO THAT, I HAVE A QUESTION. NO PROBLEM. SORRY. OKAY. LET ME BRING IT UP ABOUT OUR OUR IMPROVEMENT PLAN. IS THERE ANY WAY WE COULD JUST PUT THAT UNDER THE AFFORDABLE HOUSING PART? BECAUSE THAT'S BASICALLY WHAT IT IS. WHAT, WHAT THIS REFLECTS IS MORE OF OUR CAPITAL IMPROVEMENTS. SO THE, THE HOME IMPROVEMENT PROGRAM IS A IS A PROGRAM PROGRAM. YES. SO IT IS IN OUR OPERATING BUDGET. AND YOU WILL SEE THAT NEXT AT YOUR NEXT JUNE MEETING. OKAY. YOU'LL YOU'LL SEE THE FULL WE'LL PRESENT THE FULL BUDGET TO YOU AT THAT THAT TIME. OKAY. AND IT WOULD REFLECT ANY CHANGES OR ANY RECOMMENDATIONS THAT YOU WOULD

[01:30:02]

MAKE HERE. SO IF I'M HEARING THAT WE DON'T HAVE ANY CHANGES OR RECOMMENDATIONS HERE TO GO FORWARD WITH, THEN WE WOULD BRING BACK THE FULL BUDGET TO YOU FOR A FULL DISCUSSION. OKAY.

OKAY. WELL, THEY THE BUDGET WORK OR THE, THE OPERATING BUDGET, WILL THEY GIVE US AN UPDATE A LITTLE MORE IN DEPTH ON THE HOME IMPROVEMENT PLAN AS WELL? SO WE COULD HAVE THAT AS WE MAKE KIND OF RECOMMENDATIONS AND DECISIONS. YEAH, GREAT. OKAY. SO. I GUESS THAT'S IT. SO I WILL GO OVER TO OUR ENTERTAINING MOTION. YES, I ENTERTAIN THE MOTION OR I MAKE A MOTION TO APPROVE THE, THE CAPITAL IMPROVEMENT PROJECTS AS PRESENTED. DO I HAVE A SECOND? SECOND. OKAY. DO WE WANT TO TAKE A IS THERE ANY ADDITIONS, CORRECTIONS. SO MAY WE GET A VOTE? ALL IN FAVOR? AYE. ANY OPPOSITION HEARING? NONE. WE WILL MOVE IT FORWARD AS AS RECOMMENDATIONS TO THE CRA FOR APPROVAL. MADAM CHAIR, ANOTHER COMMENT PLEASE ON THIS. YES, I KNOW WE CLOSED IT. WELL, I KIND OF TECHNICALLY, BUT YOU CAN GO AHEAD. WELL IT'S I SHOULD SAY IT HAS NO EFFECT ON THE CAPITAL IMPROVEMENT PROJECT. OKAY. NO EFFECT ON ON THE VOTE. SO NO EFFECT ON THE VOTE. IT DOES HAVE TO DO WITH SOMETHING CHRIS SAID ABOUT SEEING KIND OF LIKE A PROFIT AND LOSS, BECAUSE YOU DID MENTION IT. THAT WOULD BE NICE TO SEE AT OUR FOLLOWING MEETING IF WE COULD, BECAUSE 7 MILLION, I'M NOT SURE WHERE THE MAKEUP'S COMING BECAUSE WE'VE GOT SIGNIFICANT EXPENDITURES IN THE NEXT TWO YEARS. IF WE'RE GOING TO HAVE A SHORTAGE, WE WOULD WANT TO KNOW IT WOULD AFFECT. RIGHT. AND SO WHERE THAT'S COMING FROM TO, TO FUND THE LARGER PROJECTS IS IN CARRY FORWARD. SO WHERE YOU ONCE HAD BUDGETED A SIGNIFICANT AMOUNT OF FUNDS IN FIRST, 10TH AND 12TH THIS YEAR, WE CARRY THAT FORWARD. SO YOU'LL HAVE APPROXIMATELY 24.8 MILLION AVAILABLE FOR CAPITAL PROJECTS, RIGHT? SO THAT GOING FORWARD, WHEN IT WHEN IT'S NOT SPENT, IT CARRIES FORWARD TO ANOTHER SPECIFIC PROJECT OR TO PAY DOWN DEBT OR TO RETURN. THANK YOU. OKAY. THANK YOU. IS THERE ANY OTHER COMMENTS ON THAT? OKAY.

[9.A) CRA Administrator's Report April 2026.]

ALL RIGHT. THE NEXT ITEM FOR DISCUSSION IS ADMINISTRATIVE REPORT. AND I WILL AGAIN TURN THAT OVER TO MISS ANITA. YEAH, SURE. I PROVIDED A MEMO TO YOU, AND I'LL BE HAPPY TO ANSWER ANY QUESTIONS ABOUT ANY OF THE PROJECTS THAT WERE OUTLINED IN THAT MEMORANDUM. OKAY. ARE THERE ANY QUESTIONS ON THAT? I HAVE NO QUESTIONS. ANITA, YOU DO SUCH A GREAT JOB AND SUCH A DETAILED REPORT THAT EVERYONE IS COMPLETELY SATISFIED WITH IT. AND WE THANK YOU VERY, VERY MUCH AND KEEP UP THE GOOD WORK. THANK YOU. OKAY. AT THIS TIME, IS THERE ANY PUBLIC COMMENT? I

[10) PUBLIC COMMENT]

HAVE NO SLIPS. OKAY. HEARING, NO PUBLIC COMMENTS. I WILL ENTERTAIN ANY COMMENTS FROM OUR

[11) COMMUNICATIONS FROM CRAAB CHAIR, MEMBERS AND STAFF]

BOARD AT THIS TIME. I WILL I WILL POSE ONE TO OUR OUR NEWEST MEMBER. ANY ANY ANY COMMENTS ON YOUR FIRST DAY? NO, IT'S IT'S VERY INTERESTING. AND I REALLY LOOK FORWARD TO SERVING WITH YOU ALL. AND YEAH, I GOT A LOT TO LEARN, BUT I'LL GET THERE EVENTUALLY. SO THANK YOU ALL.

AND IF MR. DAVIDSON, IF YOU'D JUST LIKE TO TAKE A FEW MINUTES TO TELL THE BOARD A LITTLE BIT ABOUT YOUR BACKGROUND, OTHER BOARDS YOU'VE SERVED ON AND YOUR PROFESSION, I THINK THAT THEY WOULD APPRECIATE THAT AS WELL. SO I'M A CIVIL ENGINEER, BORN AND RAISED IN NAPLES, ACTUALLY BORN RIGHT DOWN THE STREET AT NAPLES COMMUNITY HOSPITAL. SO AGAIN, SEEING PLANS AND STUFF IS WHAT I DO FOR A LIVING. SO IT'S COOL TO SEE THAT TIED INTO THIS BOARD.

I PREVIOUSLY JUST GOT DONE SERVING ON THE CODE ENFORCEMENT BOARD. SO IT'S, IT'S NICE TO HAVE SOMETHING THAT'S A LITTLE LESS CONTENTIOUS. SO IT'S A NICE CHANGE OF PACE, BUT I'M JUST LOOKING FORWARD TO AGAIN, BEING ON HERE AND ON THIS BOARD AND GETTING INVOLVED IN A LOT OF THESE CAPITAL IMPROVEMENT PROJECTS, WHICH ARE ARE CRITICAL TO THE CITY. SO. THANK

[01:35:05]

YOU FOR YOUR INPUT, AND WE DEFINITELY LOOK FORWARD TO YOUR CONTINUED INPUT. THANK YOU. AND YOU KNOW, WE'RE A LOT MORE FUN THAN THE CODE ENFORCEMENT. ANYONE ELSE HAVE ANY COMMENTS? THANK YOU. LIANE, WHAT A GREAT TIME FOR YOU TO COME ON WITH SOME OF THESE PROJECTS WE HAVE COMING. WE'RE REALLY LOOKING FORWARD TO YOUR INVOLVEMENT. THANK YOU. EVERYONE. OKAY.

MADAM ATTORNEY, ANY COMMENTS FROM YOU? I DO NOT THANK YOU. OKAY. WELL, THANK YOU ALL VERY

[12) ADJOURN]

MUCH. AND I WILL NOW ENTERTAIN A MOTION TO ADJOURN. MAKE A MOTION TO ADJOURN. SECOND. OKAY.

ALL IN FAVOR? AYE. OKAY. OKAY. ME

* This transcript was compiled from uncorrected Closed Captioning.